03.01.2015 Views

Metrobus Transit Study.pdf - City of St. John's

Metrobus Transit Study.pdf - City of St. John's

Metrobus Transit Study.pdf - City of St. John's

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>St</strong>. John’s Transportation Commission (<strong>Metrobus</strong>) 2011<br />

Market Assessment and <strong>St</strong>rategic Directions <strong><strong>St</strong>udy</strong> – Reference List<br />

Table 23 – Communication and Coordination Recommendations<br />

Recommendation Timing Next <strong>St</strong>eps<br />

<strong>Transit</strong> Priority (Section 11.0)<br />

Work with the <strong>City</strong>’s<br />

Engineering Department to<br />

identify opportunities for cost<br />

effective transit priority<br />

solutions and include projects in<br />

road and traffic capital<br />

programs.<br />

Identify design improvements<br />

and transit priority<br />

opportunities in the vicinity <strong>of</strong><br />

the Memorial University<br />

terminal.<br />

Assess applicability <strong>of</strong> investing<br />

in GPS or Infrared emitters on<br />

buses to facilitate transit signal<br />

priority on a more system wide<br />

basis.<br />

IT<br />

ST<br />

Parking Management and Pricing (Section 15.0)<br />

Request the <strong>City</strong> to increase the<br />

cost <strong>of</strong> monthly downtown<br />

parking at <strong>City</strong> owned lots<br />

(parking cost equivalent or<br />

greater than a monthly transit<br />

pass).<br />

Work with the <strong>City</strong> to identify<br />

suitable ‘park and ride’ locations<br />

and development <strong>of</strong> a fare and<br />

service integration strategy.<br />

Encourage that the Cash in Lieu<br />

<strong>of</strong> Parking program be modified<br />

to include transit support as a<br />

possible solution to future<br />

parking issues.<br />

Encourage the implementation<br />

<strong>of</strong> the parking cash out<br />

program, (perhaps starting with<br />

city employees).<br />

ST<br />

Establish a <strong>Transit</strong> Priority task force or similar group<br />

to lead the effort to enhance transit service in <strong>St</strong>.<br />

John’s. Specifically, a <strong>Transit</strong> Priority task force would<br />

concern itself with moving forward the goals <strong>of</strong>:<br />

a) Maintaining efficient transit service<br />

b) Achieving on-time performance targets<br />

c) Improving the image <strong>of</strong> public transit as a fast and<br />

reliable travel alternative.<br />

Membership on this task force would include staff<br />

from <strong>Metrobus</strong>, Engineering, Public Works and<br />

Planning departments.<br />

Implementation should be led by Engineering (Design<br />

and Construction) and specific locations/projects<br />

should be included in future capital budgets.<br />

An initial study may be required to determine<br />

feasibility <strong>of</strong> locations and appropriate technology.<br />

Establish a Task Force to address downtown<br />

accessibility and parking issues. This should include<br />

<strong>Metrobus</strong> representative at the staff level.<br />

Dillon Consulting Limited Page 116

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!