10.11.2012 Views

Download - Salzgitter AG

Download - Salzgitter AG

Download - Salzgitter AG

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Derivation of Net Loss from Gross Loss<br />

Risk prior<br />

to measures<br />

Avoidance<br />

e.g. avoidance<br />

of high-risk<br />

transactions<br />

Minimizing<br />

e.g. operating<br />

instructions<br />

Transfer<br />

e.g. insurance<br />

to cover<br />

operational<br />

downtime<br />

Risk after<br />

measures<br />

Gross loss Net loss<br />

With regard to the extent of loss or damage, a distinction is drawn between major risks in excess of<br />

€ 25 million and other risks involving loss or damage of less than € 25 million. Risks must be recorded<br />

within the internal planning and controlling systems of the respective companies and communicated<br />

to Group management in accordance with the specific company reporting thresholds.<br />

It is evident that, at present, even a number of major risks of € 25 million incurred in parallel<br />

would not be sufficient to endanger the Group as a going concern. We consider it expedient, however,<br />

not to raise the reporting threshold.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!