A multi-year radio system replacement project is underway with design <strong>and</strong> planning of<br />
optimal sites for location of new radio towers being planned. This $34 million project is<br />
the result of FCC regulations requiring changes in technology <strong>and</strong> operating frequency to<br />
be in place by <strong>2013</strong>. The radio system upgrade will incorporate Automated Vehicle<br />
Locator (AVL) technology. The addition of AVL should result in operating savings of<br />
more than $500,000 annually. If the radio project were not undertaken, the operational<br />
issues that would result from losing operating radio frequency would be unacceptable.<br />
<strong>Transit</strong> Development - Facility, Centers, Stations, Parking Lots, Loops,<br />
Other<br />
Planning is underway for a downtown bus transfer center <strong>and</strong> a transfer center in the<br />
North County portion of our service area. With the construction of these two new<br />
facilities, additional operating costs will be necessary to provide for positions,<br />
maintenance contracts <strong>and</strong> utilities. Seven other centers have been built since 2002.<br />
They include Ballas, North Broadway, Clayton, Civic Center at 14 th <strong>and</strong> Spruce,<br />
Shrewsbury, Riverview <strong>and</strong> Meridian <strong>Metro</strong>Bus Center. These centers permit improved<br />
transfers between bus routes in a safe <strong>and</strong> secure location. These transfer centers have<br />
added $160,000 annually for maintenance contracts, utilities, additional positions, <strong>and</strong><br />
l<strong>and</strong>scaping.<br />
Parking lot upgrades at our five operating facilities, ADA access improvements <strong>and</strong> other<br />
service improvements at our North Hanley transit center will decrease current<br />
maintenance efforts. These projects continue the hub <strong>and</strong> spoke system <strong>Metro</strong> created<br />
nine years ago to support better transfer options for customers connecting via bus-to-bus<br />
or bus-to-rail.<br />
Information Technology Improvements<br />
Investments to improve Customer Service Information <strong>and</strong> Operations Management are<br />
planned over the three-year period. Additional technology upgrades will include a<br />
number of enhancements to the systems that will improve our customer relations <strong>and</strong><br />
system management efforts without increasing manpower costs.<br />
Long Range <strong>Capital</strong> <strong>and</strong> <strong>Operating</strong> <strong>Budget</strong> Impacts<br />
Planning <strong>and</strong> alternative analysis for Bus Rapid <strong>Transit</strong> (BRT) is planned during the<br />
current capital budget period. As a part of long range capital planning, funding will be<br />
sought to support system improvements <strong>and</strong> equipment needs to build <strong>and</strong> operate BRT<br />
corridors. <strong>Capital</strong> <strong>and</strong> operating costs will be determined based on outcomes of the<br />
alternatives analysis <strong>and</strong> design of the BRT corridors.<br />