<strong>Kangaroo</strong> <strong>Island</strong> <strong>Airport</strong> Upgrade <strong>Business</strong> <strong>Case</strong><br />

• Option 4: The level of investment required to accommodate single-aisle mainline jet<br />

services (B737 /A320) to sectors as far as Perth.<br />

Some general comments regarding the options considered are set out below.<br />

Aircraft movements and runway needs<br />

It was accepted that a single main runway will cope with the forecast in RPT traffic for<br />

the foreseeable future. However:<br />

• the pavements will require strengthening to cater for heavier aircraft through the<br />

application of additional layers of crushed gravels and bituminous/asphalt<br />

resurfacing of Runway 01/19, the taxiway A, and apron in front of the terminal;<br />

• options considered will require an extension to Runway 01/19 to accommodate<br />

different aircraft including option 3 which will require a runway length of 2100m – an<br />

extension of 698m over the existing sealed runway. It will also require that in<br />

addition to the 30m width a 3m wide compacted and erosion resistant gravel<br />

shoulders be constructed;<br />

• options considered widening the taxiway A and for example Option 3 requires a 3<br />

metre wide compacted and erosion resistant shoulder to be provided on the existing<br />

15m taxiway; and<br />

• the options considered widening the apron from 68m to 71m.<br />

Terminal<br />

A new terminal layout is proposed to deal with the increased internal needs of<br />

passenger numbers and security, which can be seen in the below figure. The layout<br />

aims to retain as much of the existing terminal as possible to minimise costs. The<br />

majority of the existing terminal becoming the arrivals lounge and the existing hire<br />

vehicle desks, offices and toilets can all be maintained. The expansion largely occurs<br />

on the western side of the existing terminal.<br />

The new area will comprise of:<br />

• A kiosk;<br />

• A check-in area;<br />

• Passenger and baggage screening area;<br />

• A secure departure lounge with a set of toilets; and<br />

• A baggage reclaim area.<br />