create sense of visual depth with massed plantings that include vegetation<br />

of various textures, sizes, and colors.<br />

b. Access Roads<br />

Entrance and site access roads should be designed to meander<br />

through the buffer to limit views into the larger development. Trees<br />

are especially important along access roads to limit broad views of<br />

the development and provide enclosure. A single access road to new<br />

rear lot development is required from <strong>Route</strong> <strong>132</strong>, though additional<br />

access may be gained through entrances from other major roadways<br />

and through interconnections with adjacent developments. Pedestrian<br />

access should be provided within the public right-of-way along<br />

the <strong>Route</strong> <strong>132</strong> road frontage, with a grass strip or landscaping separating<br />

the pedestrian way from the road surface.<br />

F. DESIGN GUIDELINES: AREA D – <strong>Cape</strong> <strong>Cod</strong> Mall <strong>Route</strong> 28<br />

Entrance<br />

Design Guidelines for this portion of the study area, the back entrance<br />

to the <strong>Cape</strong> <strong>Cod</strong> Mall along <strong>Route</strong> 28, seek to establish a new small scale<br />

commercial or mixed use area with pedestrian scale features that can<br />

serve as a transition between the larger mall development and the residential<br />

area to the south of <strong>Route</strong> 28. This area is currently defined by<br />

wide open parking lots located to the rear of the <strong>Cape</strong> <strong>Cod</strong> Mall. New<br />

buildings should be focused along the internal road network and should<br />

take advantage of green space adjacent to the existing ponds nearby. A<br />

substantial landscaped buffer should be retained at the intersection with<br />

<strong>Route</strong> 28.<br />

The parking area where this development is proposed is largely underutilized,<br />

even during the summer and holiday seasons, but a parking deck<br />

would likely be necessary elsewhere on the Mall property to address parking<br />

needs if this new development is allowed.<br />

1. Area D - Guidelines<br />

a. Building Setbacks<br />

New buildings within the Mall property should be set back 50 to 100<br />

feet from the <strong>Route</strong> 28 property line. New buildings should be set<br />

back 10 to 15 feet from the internal roadway edge within the Mall<br />

property to foster pedestrian activity.<br />

september 2010 | route <strong>132</strong> corridor <strong>Report</strong> 67