15.11.2012 Views

Integrated and Modular Systems for Commercial ... - Nonstop Systems

Integrated and Modular Systems for Commercial ... - Nonstop Systems

Integrated and Modular Systems for Commercial ... - Nonstop Systems

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Modular</strong> Flight Control & Guidance Computer<br />

Current FCGC-program development status:<br />

• demonstrator program in cooperation with DASA<br />

• simulator <strong>and</strong> A340-rig tests: ongoing since 1Q91<br />

• flight test scheduled <strong>for</strong> 1Q98 on VFW614 test bed<br />

• certification: primary flight control only<br />

(incl. dynamic task-reconfig concept)<br />

• development & test program: full-function FCGC<br />

BGT Bodenseewerk<br />

Gerätetechnik GmbH<br />

105<br />

©1995-1997 F.M.G. Dörenberg

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!