15.11.2012 Views

Integrated and Modular Systems for Commercial ... - Nonstop Systems

Integrated and Modular Systems for Commercial ... - Nonstop Systems

Integrated and Modular Systems for Commercial ... - Nonstop Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IMA cost indicators <strong>and</strong> prediction<br />

• LCC cost drivers (RC & NRC):<br />

� design & development cost & risk<br />

� hardware, mechanical, data/signal<br />

interconnects, power interconnects<br />

� use of st<strong>and</strong>ard components, OS,<br />

� complexity<br />

� certification aspects<br />

� re-useability (future savings)<br />

� weight/size/power/cooling<br />

� installation<br />

� maintenance, support (NFF, spares, rel., org.)<br />

� etc.<br />

- IMA does not have an intuitively obvious bottom line advantage -<br />

94<br />

©1995-1997 F.M.G. Dörenberg

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!