APPENDIX 1/5: TESTING TO BE CARRIED OUT BY THE CONTRACTOR<br />

General<br />

1. The Contractor shall carry out testing in accordance with Table 1/5 in this Appendix.<br />

2. Tests comparable to those specified in this Appendix will be necessary for any equivalent work,<br />

goods or materials proposed by the Contractor (see Clause 105.4).<br />

3. (N) indicates that a UKAS (NAMAS) sampling and test report or certificate is required.<br />

4. Unless otherwise shown in this Appendix test certificates for work, goods on materials as<br />

scheduled under any one Clause are required for all such work, goods or materials in the Works.<br />

5. Unless otherwise shown in this Appendix tests for work, goods on materials as scheduled under<br />

any one Clause are required for all such work, goods or materials in the Works.<br />

6. All laboratory testing shall be carried out by a testing house which is independent of the<br />

Contractor and is not within the same group of companies as the Contractor.<br />

7. Special National Alterations of the Overseeing Departments of Scotland, Wales or Northern<br />

Ireland are to be regarded as part of the main Specification clauses for the purposes of testing.<br />

8. Cube strengths are not required for concrete complying with Clause 2602.<br />

9. The main specification for testing is the Specification for Highways Works. Testing under Series<br />

500 will also require testing as detailed in the Civil Engineering Specification for the Water<br />

Industry 6 th Edition June 2004.<br />