chipping and grinding. No blasted surface shall be left overnight<br />

before painting. All interfaces of connections, except those which<br />

are to be clamped together by friction grip bolts, shall be fully<br />

primed before assembly.<br />

The Steelwork Sub-Contractor shall take all necessary precautions<br />

to satisfy the relevant sections of the Factories Act and any other<br />

regulations governing the handling and welding of primed steelwork.<br />

Care shall be taken to remove grease and oil including cutting oil,<br />

from the primed steel surfaces immediately prior to painting.<br />

If the primed surface has become contaminated with dirt or soluble<br />

salts etc, these shall be removed with clean water and the surface<br />

then allowed to dry. Handling of the coated steel shall not take<br />

place until all the coating is touch dry. Coated Steelwork shall be<br />

protected against mechanical damage during handling,<br />

transportation and erection. Fabricated steelwork which is to be<br />

stored either on site or in the works, awaiting delivery or erection,<br />

shall be kept clear of the ground and stored on suitable packing in<br />

such a way as to ensure that the minimum amount of water or dirt<br />

comes in contact with the coated steel. Suitable packings shall also<br />

be placed between layers of stocked steelwork.<br />

All sharp edges on steel sections etc. shall be removed by light<br />

grinding to improve the quality of the final paint system. Such<br />

edges in addition shall be "stripe" painted first, to allow a build up of<br />

paint on the steel edges, prior to the application of the paint<br />

generally.<br />

The following is a summary of the anti-corrosive paint system. The<br />

paint system is an International Paint Company specification. Other<br />

paint manufacturer's anti-corrosive paint systems, of equal quality<br />

and performance, may be substituted providing the Engineer's<br />

written approval is obtained.<br />

Shop primer: Apply Interplate 180 (2 pack Epoxy primer<br />

with zinc phosphate and iron oxide) to blast cleaned steel<br />

at works immediately or within 2 hours of blast cleaning. After<br />

fabrication carry out remedial treatment of damaged areas and<br />

welds the latter by blast cleaning followed by touch up with<br />

Interplate 180.<br />

Dry film thickness: 25 micrometres.<br />

- Shop Second coat: Intergard 251 (colour to be defined by CA).<br />

80