07.06.2015 Views

SECTION B - Derry City Council

SECTION B - Derry City Council

SECTION B - Derry City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX 7/1: PERMITTED PAVEMENT OPTIONS (CONTINUED)<br />

4. Permitted Construction Materials – Schedule 3<br />

Pavement Option A1<br />

Pavement<br />

Layer<br />

Surface<br />

Course<br />

Base<br />

Course<br />

Material Ref.<br />

Thickness (mm)<br />

SCA1 - Rolled Asphalt Surface Course or SMA 40<br />

BCA1 - Dense Macadam Base Course 60<br />

Sub- Base SBA1 - Granular Sub-base material Type 3 150<br />

Road-base SBA1 - Granular Road base material Type 3<br />

(Provisional, to be confirmed by Project Manager on site<br />

upon reduced dig for new roads and carparks)<br />

450<br />

Total<br />

700<br />

Thickness<br />

Capping If required To be confirmed<br />

5. General Requirements For Construction Materials– Schedule 4<br />

Schedule 4: (11/04) General requirements Construction Materials<br />

Clause Requirement<br />

801.2 unbound mixtures shall not be deposited as described as per sub-Clause 801.2<br />

801.3 unbound mixtures shall not be deposited as described as per sub-Clause 801.3<br />

801.7 Materials to comply with 801.7<br />

802.4 Unbound Materials up to 225 mm compacted thickness to be spread in two layers<br />

802.14 N/A<br />

901.2 and<br />

Requirement as per sub-Clause 901.2 and 942.5<br />

942.5<br />

901.19 Requirement as per sub-Clause 901.19<br />

901.28 Requirement as per sub-Clause 901.28<br />

1001.2 N/A<br />

1004.7 N/A<br />

1028 N/A<br />

1033.10 N/A<br />

211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!