APPENDIX 5/1: DRAINAGE REQUIREMENTS<br />

1 Layout of drainage of amenities and roads shall be constructed as shown on contract drawings.<br />

The connection of new drainage systems to the existing combined drainage system to be agreed<br />

on site, with Project Manager.<br />

2 Drainage gullies and chambers shall be constructed and detailed as shown on the contract<br />

drawings.<br />

3 The bedding detail to foul and storm drainage is to be Type S as shown on Drawing No. F1,<br />

MCDHW, Volume 3, “Highway Construction Details”. All bedding materials to SHW Clause 503.3.<br />

Where the drain crosses under a carriageway, the backfill above the pipe bedding is to be well<br />

compacted Type 3 material, and comply with any other requirements set down by DRD Roads<br />

Service, or with C20/20 mass concrete as indicated on Drawing No. 073030/GA/35, pending on the<br />

depth of cover to the crown of the pipe.<br />

4 The bedding detail to filter drains to be Type L as shown on Drawing No. F2, MCDHW, Volume 3,<br />

“Highway Construction Details”. All filter material to be Type A. Were the filter drain crosses under a<br />

carriageway, the filter materials are to be substituted by well compacted Type 3 material.<br />

5 Joints to surface water and foul drains shall be watertight. Ridged joints shall not be used.<br />

6 Chamber sizes are indicated on the contract drawings and all in accordance with Standard<br />

Drawings Section 1, Series F of Volume 3 of the Manual for Contracts Documents for Highway<br />

Works.<br />

7 Gully gratings and frames shall be ductile iron to BS EN 124 Group 3.<br />

8 Saddles may be used for gully connections to the filter drains to Cause 508.7.<br />

9 All new road gully chambers shall be trapped, and shall comply with Highway Construction Detail<br />

Drawing No. F13 and Clause 508 of the Specification.<br />

10 Drainage to Structures<br />

The drainage to be provided behind the new contractor designed gabion walls, reinforced earth<br />

walls and crib walls will form part of the contractor’s design but should not comprise less than a 150<br />

mm diameter (minimum) uPVC rigid walled perforated pipes.<br />

11 Testing and cleaning of all foul and storm water drains to comply with clause 509 and as described<br />

listed in Appendix 1/5. Chambers on the foul and storm drainage shall be tested for water-tightness.<br />

All carriers, foul, storm drains to be surveyed by CCTV and copy of survey to be forwarded the<br />

Project manager for approval, before the drainage is brought into use<br />