APPENDIX 6/3: REQUIREMENTS FOR EXCAVATION, DEPOSITION, COMPACTION (OTHER THAN<br />

DYNAMIC COMPACTION) ETC.<br />

1 The Contractor is to provide a detailed earth works management plan which will be submitted to the<br />

Department. The Management plan is to include method of run-off from the work areas and details of<br />

mitigation measures against pollution of watercourses before any work commences on site.<br />

2 Earthworks requirements are shown on the following drawings: 073030/GA/14 -21<br />

3 Blasting is not permitted as an alternative to normal excavation methods.<br />

4 Cutting Faces<br />

i. All fill material used to backfill behind the new contractor designed gabion wall and<br />

reinforced earth slopes to consist of clean well graded granular stone, to Designer’s<br />

specification.<br />

ii.<br />

Contractor shall take all necessary measures to ensure that excavations are kept stable and<br />

free from water. Contractor to include for these provisions in his rates as indicated in the<br />

preamble to Bill of Quantities.<br />

iii.<br />

Contractor to be responsible for all costs associated with excavating and back filling to any<br />

over dig due to battered excavations, etc being greater than the net volume required for the<br />

permanent works.<br />

iv.<br />

Slopes in rock cuttings where blocky material is present to be prepared by trimming to form<br />

a stepped, stable face. Closely jointed area to be carried out incrementally as the face is<br />

prepared. Widely jointed areas to be pressure tested with air to remove loose materials.<br />

v. Toe drains shall be installed at the base of the cuttings for collection of run off.<br />

vi.<br />

All cut off drains alongside cuttings shall be completed prior to commencement of any<br />

adjacent earthworks excavations.<br />

vii.<br />

All trimming shall be carried out incrementally.<br />