• Contamination: Do not mix topsoil with:<br />

- Subsoil, stone, hardcore, rubbish or material from demolition work.<br />

- Other soil or material containing aggressive weeds, sharps, plastics<br />

and non soil forming<br />

materials and notifiable animal or plant diseases.<br />

- Oil, fuel, cement or other substances harmful to plant growth.<br />

- Other classifications of topsoil.<br />

• Multiple handling: Keep to a minimum. Use topsoil immediately after stripping.<br />

168 GENERAL SITE CLEARANCE<br />

o<br />

o<br />

o<br />

o<br />

o<br />

General: Clear site of all rubbish, debris and vegetation. Do not compact topsoil,<br />

leaving site ready for planting works<br />

Treatment: translocated herbicide<br />

Works to be undertaken during reasonable dry weather to avoid compaction<br />

Taken off site or suitable material to be used as fill material in the Chapel Garden<br />

Keep all roads clean and tidy during the works<br />

174 POTECTION OF EXISTING VEGETATION<br />

Protect all Vegetation and Trees to be retained with appropriate fencing during<br />

the works as per BS 5837: 2005 Trees in relation to Construction<br />

175 TREE ROOT BARRIERS (Reroot 2000 – 1mm thick by 2000mm deep)<br />

o Root barrier: Reroot 2000 linear root barrier or equal and approved<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

Product reference: RER 210 - Reroot 2000 – 1mm thick by 2000mm deep, 100lm<br />

rolls<br />

Supplier: Greenleaf Ireland, Ivy House, 24a Church Road, L'<strong>Derry</strong> BT47 3QQ<br />

Tel: +44 (0)28 7134 5620<br />

Location: to be fitted tightly to the base of retaining walls to protect base of<br />

retaining walls and concrete foundations – see Engineers details<br />

Installation: as per manufacturer’s instructions. Join all ends by overlapping and<br />

tape both sides with Greenleaf Reroot jointing tape where required<br />

Backfill material: Good quality topsoil 700-900mm deep, on 400-600mm<br />

subsoil, left in preparation for the landscape Contractor to plant Trees and<br />

Shrubs<br />

Backfilling: Lay and compact lightly in layers not more that 300mm thick.<br />

176 TREE ROOT BARRIERS (Reroot 2000 – 2mm thick by 1500mm deep)<br />

o Root barrier: Reroot 2000 linear root barrier or equal and approved<br />

o Product reference: RER 220 - Reroot 2000 – 2mm thick by 1500mm deep, 100m<br />

rolls<br />

o Supplier: Greenleaf Ireland, as above<br />