SECTION B - Derry City Council

SECTION B - Derry City Council

SECTION B - Derry City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contractor,<br />

• including awaiting approvals, resubmissions and modifications.<br />

• Restrictions on site access in the proximately of areas with Japanese Knotweed as<br />

detailed in Appendix 1/7.<br />

• Submission by the Contractor of Road Restraint Systems for acceptance, including<br />

awaiting acceptance and resubmission.<br />

7 The Contractor may be require to cease all noisy operations while burials are being undertaken at<br />

the cemetery (i.e. operations generating noise levels in excess of 60dB). The Contractor shall<br />

keep accurate records of any such ‘Quite Times’ and have these countered signed by <strong>Council</strong><br />

staff who are attendant at the burials. Payment for any such ‘Quite Times’ will not be paid without<br />

evidence of such countered signed records.<br />

8 The level of detail shown on the programme should be not less than the following:<br />

LEVEL 1: Within 21 days after acceptance of Tender and any subsequent revision.<br />

- Site Setup<br />

- Bulk Earthworks<br />

- Foundations<br />

- Roads Works<br />

- Concrete Paths<br />

- Fencing, guard rails<br />

- Production of all fabrication drawings<br />

- Retaining Structures<br />

- Reinforced concrete structures<br />

- Masonry works<br />

- Safety Fences<br />

- Topsoiling & Seeding<br />

- Finishes<br />

- Site drainage<br />

- M&E Services<br />

- Traffic Management Measures<br />

LEVEL 2: At least four weeks before the commencement of any item of work:<br />

For each structure:<br />

- Earthworks<br />

• Foundations<br />

• Concrete works<br />

• Masonry<br />

- Road works<br />

165