Additional Clauses, Tables and Figures (Cont.)<br />

Clause<br />

(etc)<br />

770AR<br />

No<br />

Title and written text<br />

SURFACE CONDITION<br />

1. The contractor shall thoroughly clean the existing or prepared surface of all<br />

loose materials or foreign matter prior to laying macadam or asphalt, to the<br />

satisfaction of the Project Manager.<br />

2. If the Project Manager considers the surface too damp for laying the Contractor<br />

shall dry the surface by the application of limestone dust or hydrated lime to<br />

absorb any surface water and sweeping the whole surface to remove all traces<br />

of the material. No laying of bituminous material shall take place until the<br />

surface is dry to the satisfaction of the Project Manager.<br />

771AR<br />

SURFACING REINSTATEMENTS<br />

1. All areas of excavated bitumen and asphalt surfacing, removed to allow<br />

inspection and testing works to be undertaken, shall be reinstated<br />

permanently using the original construction materials. Associated cutting<br />

back and joint sealing will also be required. All materials shall be laid by<br />

hand.<br />

2. Sides of all excavations in bitumen or asphalt surfacing shall be broken out<br />

so as to provide a cut-out with straight vertical sides.<br />

3. Joint edges shall be formed by diamond saw cutting or cold milling in<br />

accordance with Clause 709 and materials removed to the required depth.<br />

The vertical faces of wearing course joints shall be painted with grade 160 /<br />

220 pen bitumen or a cold applied thixotrophic bitumen.<br />

4. All loose material shall be removed from the Works to an approved licensed<br />

tip/ recycling area.<br />

5. Replacement material shall match the existing removed materials.<br />

6. A bitumen emulsion tack coat shall be sprayed at the rate specified in<br />

Appendix 7/4 to any underlying exposed bituminous layer.<br />

All construction layers shall be laid and compacted such that on completion each<br />

layer shall be at the same level as the adjacent course within the tolerances indicated<br />

in Table 7/1.<br />

18