APPENDIX 25/2: REQUIREMENTS FOR REINFORCED SOIL AND ANCHORED EARTH<br />

STRUCTURES<br />

All earth retaining walls shall have a natural looking stone finish as Acheson and Glovers Anchor<br />

Landmark Basalt or equal and approved.<br />

The earth retaining structures shown in outline in the drawings 073030/GA/14 to 21 and in elevation on<br />

drawings 073030/GA/22 and 23 shall be designed and constructed by the contractor.<br />

The retaining wall system selected for each section shall not take up an extent of land take that will cause<br />

a reduction in the area and dimensions shown on the drawings for any of the other facilities that make up<br />

the works shown on the drawings including roads, graveplots, paths, headstone foundation, buildings,<br />

access areas, planting areas and landscape areas and existing areas that are to be maintained. Where the<br />

selected retaining wall system is located adjacent to a graveplot area the contractor must demonstrate that<br />

graves can be dug immediately behind the wall without compromising the stability and safety of the wall or<br />

the excavation.<br />

Reinforced Earth Retaining Walls<br />

Reinforced Earth Retaining Walls - see Drawing No. 073030/GA/12, 13, 22 & 23 for location, layout and<br />

details of reinforced earth slopes and associated works encompassed by the “Designated Outline”<br />

Reinforced earth Retaining Walls to comply with Clause 622 of the Specification and Appendix 6/10 of the<br />

Specification.<br />

Design for reinforced earth slopes shall comply with all the relevant design guides and advice notes in the<br />

Highway Agency’s, Design Manual For Roads And Bridges DB2/05 Technical approval of Highway<br />

Structure, HA68/94 - Design Methods for the Reinforcement of Highway Slopes by Reinforced Soil and<br />

Soil Nailing Techniques. Minimum unfactored design live load surcharge to the top of the slope is 10<br />

kN/m 2 .<br />

The design shall comply with BD70/03 Strengthened / Reinforced soils and other fills for Retaining Walls<br />

and Bridge Abutments<br />

The design of the retaining walls including the facing units and reinforcing elements shall comply with BS<br />

8006-1:2010 Code of Practice for strengthened / reinforced soils and other fills.<br />

The design of the retaining walls shall comply with BSEN 14475:2006 Execution of special Geotechnical<br />

works. Reinforced Fill.<br />