07.06.2015 Views

SECTION B - Derry City Council

SECTION B - Derry City Council

SECTION B - Derry City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

indicating washer on the bolt, and the method of tightening and<br />

measurement, shall be strictly in accordance with the<br />

manufacturer's recommendations. A plain hardened steel washer<br />

shall be used under the part of the bolt being turned during<br />

tightening operations.<br />

Irrespective of the tightening procedure, the Steelwork Sub-<br />

Contractor shall provide the Engineer with a Schedule of all HSFG<br />

bolts to be used on the Contract. This schedule should indicate the<br />

location of each bolt and the type of fabrication into which it is fitted.<br />

After final tightening of bolts the schedule must be signed by the<br />

Steelwork Sub-Contractor's erection supervisor. A copy of the<br />

completed bolt schedule must be forwarded to the Engineer for<br />

record purposes. If after final tightening, a nut or bolt is slackened<br />

off for any reason, the bolt, nut and washer or washers shall be<br />

discarded and not used again.<br />

The Steelwork Sub-Contractor is to take all necessary precautions<br />

to ensure the stability and safety of the steelwork structure during<br />

erection and shall maintain any special temporary guying or other<br />

supports until the structure is completed, and the Steelwork Sub-<br />

Contractor shall be entirely responsible for any accidents which may<br />

arise from lack of suitable precautions.<br />

Extra care shall be exercised by the Steelwork Sub-Contractor<br />

when handling steelwork which is metal sprayed, galvanised or<br />

coated with anti-corrosive paint treatment. In order to avoid<br />

damage to these coatings padded slings should be used for lifting<br />

the steelwork. Temporary timber packers and spacing members<br />

shall be used extensively during transport, storage and erection, in<br />

an effort to reduce the possibility of damage to the treated surfaces<br />

of the steel.<br />

Zinc or Cadmium plated bolts, nuts and washers shall be used in<br />

the assembly and erection of all galvanised or specially treated<br />

steelwork.<br />

11 SETTING OF STEELWORK<br />

Unless otherwise specified stanchion bases are to be set on the<br />

concrete on steel wedges leaving a nominal gap of 40 mm and<br />

when the steelwork has been accurately levelled and aligned the<br />

space beneath will be filled by the Main Contractor with fluid<br />

Portland Cement mortar.<br />

68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!