SECTION B - Derry City Council
SECTION B - Derry City Council
SECTION B - Derry City Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
indicating washer on the bolt, and the method of tightening and<br />
measurement, shall be strictly in accordance with the<br />
manufacturer's recommendations. A plain hardened steel washer<br />
shall be used under the part of the bolt being turned during<br />
tightening operations.<br />
Irrespective of the tightening procedure, the Steelwork Sub-<br />
Contractor shall provide the Engineer with a Schedule of all HSFG<br />
bolts to be used on the Contract. This schedule should indicate the<br />
location of each bolt and the type of fabrication into which it is fitted.<br />
After final tightening of bolts the schedule must be signed by the<br />
Steelwork Sub-Contractor's erection supervisor. A copy of the<br />
completed bolt schedule must be forwarded to the Engineer for<br />
record purposes. If after final tightening, a nut or bolt is slackened<br />
off for any reason, the bolt, nut and washer or washers shall be<br />
discarded and not used again.<br />
The Steelwork Sub-Contractor is to take all necessary precautions<br />
to ensure the stability and safety of the steelwork structure during<br />
erection and shall maintain any special temporary guying or other<br />
supports until the structure is completed, and the Steelwork Sub-<br />
Contractor shall be entirely responsible for any accidents which may<br />
arise from lack of suitable precautions.<br />
Extra care shall be exercised by the Steelwork Sub-Contractor<br />
when handling steelwork which is metal sprayed, galvanised or<br />
coated with anti-corrosive paint treatment. In order to avoid<br />
damage to these coatings padded slings should be used for lifting<br />
the steelwork. Temporary timber packers and spacing members<br />
shall be used extensively during transport, storage and erection, in<br />
an effort to reduce the possibility of damage to the treated surfaces<br />
of the steel.<br />
Zinc or Cadmium plated bolts, nuts and washers shall be used in<br />
the assembly and erection of all galvanised or specially treated<br />
steelwork.<br />
11 SETTING OF STEELWORK<br />
Unless otherwise specified stanchion bases are to be set on the<br />
concrete on steel wedges leaving a nominal gap of 40 mm and<br />
when the steelwork has been accurately levelled and aligned the<br />
space beneath will be filled by the Main Contractor with fluid<br />
Portland Cement mortar.<br />
68