APPENDIX 1/5: TESTING TO BE CARRIED OUT BY THE CONTRACTOR (CONTINUED)<br />

Clause Work, Goods or Material Test Frequency of Testing Test Certificate Comments<br />

Series 900 (Continued)<br />

919<br />

922 Surface Dressing National quality<br />

management sector<br />

scheme applies<br />

Binder<br />

Chippings<br />

Product Identification<br />

Vialit cohesion (N)<br />

Accuracy of spread<br />

Rate of spread<br />

Penetration at 25ºC and<br />

5ºC (N)<br />

Resistance to (PSV)<br />

polishing (N)<br />

Resistance to abrasion<br />

(AAV) (N)<br />

1 per product per<br />

source<br />

1 per product per<br />

source<br />

1 for each binder<br />

sprayer per week<br />

Every 1000 linear<br />

metres initially<br />

Every batch<br />

Source approval<br />

Source approval<br />

Required<br />

Required<br />

Required<br />

Required<br />

Required<br />

Required<br />

Grading (N) 1 per 200 tonnes Required<br />

Modified binders should<br />

have a BBA HAPAS<br />

Roads and Bridges<br />

Certificate. In the event<br />

that no such Certificates<br />

have been issued, then<br />

in the interim, only<br />

modified<br />

binders undergoing BBA<br />

assessment should be<br />

considered for approval<br />

by the Overseeing<br />

Organisation.<br />

Tests are expected to be<br />

repeated every two years<br />

Tests are expected to be<br />

repeated every two years<br />

Not more than 6 weeks<br />

prior to start of work and<br />

one per week<br />

Frequency to be reduced<br />

to daily after 3<br />

satisfactory results, but<br />

not less than 1 test per<br />

site<br />

For cut back binders as<br />

supplied, manufacturer’s<br />

QA viscosity test results<br />

may be submitted.<br />

Binder content (N) 1 per 200 tonnes Required Coated chippings only<br />

Flakiness index (N) 1 per 200 tonnes Required<br />

Accuracy of spread (N)<br />

Rate of spread<br />

1 for each chipping<br />

spreader for every<br />

change of chipping size<br />

of source<br />

Every 500 linear metres<br />

initially<br />

Required<br />

Required<br />

System TAIT or BBA/HAPAS Required<br />

Rollers Spray bars working Before work starts and<br />

daily during works<br />

Initial test not more than<br />

6 week prior to start of<br />

work<br />

Frequency to be reduced<br />

to daily after 3<br />

satisfactory results, but<br />

not less than 1 test per<br />

lane per site<br />

950 Depressions BBA HAPAS Roads and<br />

Bridges certification (or<br />

equivalent) applies<br />

132