APPENDIX 1/5: TESTING TO BE CARRIED OUT BY THE CONTRACTOR (CONTINUED)<br />
Clause Work, Goods or Material Test Frequency of Testing Test Certificate Comments<br />
Series 900 (Continued)<br />
919<br />
922 Surface Dressing National quality<br />
management sector<br />
scheme applies<br />
Binder<br />
Chippings<br />
Product Identification<br />
Vialit cohesion (N)<br />
Accuracy of spread<br />
Rate of spread<br />
Penetration at 25ºC and<br />
5ºC (N)<br />
Resistance to (PSV)<br />
polishing (N)<br />
Resistance to abrasion<br />
(AAV) (N)<br />
1 per product per<br />
source<br />
1 per product per<br />
source<br />
1 for each binder<br />
sprayer per week<br />
Every 1000 linear<br />
metres initially<br />
Every batch<br />
Source approval<br />
Source approval<br />
Required<br />
Required<br />
Required<br />
Required<br />
Required<br />
Required<br />
Grading (N) 1 per 200 tonnes Required<br />
Modified binders should<br />
have a BBA HAPAS<br />
Roads and Bridges<br />
Certificate. In the event<br />
that no such Certificates<br />
have been issued, then<br />
in the interim, only<br />
modified<br />
binders undergoing BBA<br />
assessment should be<br />
considered for approval<br />
by the Overseeing<br />
Organisation.<br />
Tests are expected to be<br />
repeated every two years<br />
Tests are expected to be<br />
repeated every two years<br />
Not more than 6 weeks<br />
prior to start of work and<br />
one per week<br />
Frequency to be reduced<br />
to daily after 3<br />
satisfactory results, but<br />
not less than 1 test per<br />
site<br />
For cut back binders as<br />
supplied, manufacturer’s<br />
QA viscosity test results<br />
may be submitted.<br />
Binder content (N) 1 per 200 tonnes Required Coated chippings only<br />
Flakiness index (N) 1 per 200 tonnes Required<br />
Accuracy of spread (N)<br />
Rate of spread<br />
1 for each chipping<br />
spreader for every<br />
change of chipping size<br />
of source<br />
Every 500 linear metres<br />
initially<br />
Required<br />
Required<br />
System TAIT or BBA/HAPAS Required<br />
Rollers Spray bars working Before work starts and<br />
daily during works<br />
Initial test not more than<br />
6 week prior to start of<br />
work<br />
Frequency to be reduced<br />
to daily after 3<br />
satisfactory results, but<br />
not less than 1 test per<br />
lane per site<br />
950 Depressions BBA HAPAS Roads and<br />
Bridges certification (or<br />
equivalent) applies<br />