Hills Cement Co. Limited.<br />
There are 4 points where the dust will be generated:<br />
• .Drilling<br />
• .Blastng<br />
• .Transportation<br />
• .Waste dumping places<br />
Although these are on so minor scale that they will not generate much<br />
dust. Air pollution is anticipated during blasting and movement of trucks.<br />
Regular water spray over the transportation road as well as wet drilling is<br />
proposed to minimize the dust generated during drilling and blasting. This<br />
water spraying over the road is to be done twice a day during summer and<br />
once a day during winter. The following monitoring schedule is<br />
recommended for regular check to ensure the SPM level and Ambient Air<br />
Quality-<br />
Ambient Air Monitoring :Once in six Months in the mine area.<br />
Ambient Air Monitoring :Once in a year in the surrounding area.<br />
Noise Nuisance Abatement-<br />
Proper maintenance of machineries and transport vehicles should be done<br />
to reduce the noise and keep the same within permissible limits. Noise<br />
level measurements in the mine area should be carried out once in every<br />
six months.<br />
Measures to improve natural resources-<br />
The project will lead to permanent depletion of non –renewable mineral<br />
resources. While this adverse impact is inevitable in case of all mining<br />
activities, the damage can be ameliorated to an appreciable extent by<br />
reclamation of mined area in the shape of back filling of the exhausted pits<br />
and plantation on maximum area of back filled pits and dumps.<br />
<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 111