Hills Cement Co. Limited.<br />
12. Air quality modeling should be<br />
carried out for prediction of impact of<br />
the project on the air quality of the<br />
area. It should also take into account<br />
the impact of movement of vehicles<br />
for transportation of mineral. The<br />
details of the model used and input<br />
parameters used for modeling<br />
should be provided. The air quality<br />
contours may be shown on a<br />
location map clearly indicating the<br />
location of the site, location of<br />
sensitive receptors, if any and the<br />
habitation. The wind roses showing<br />
pre-dominant wind direction may<br />
also be indicated on the map.<br />
13. The water requirement for the<br />
project, its availability and source<br />
along with the permission from the<br />
Competent Authority should be<br />
included. A detailed water balance<br />
should also be provided. Fresh<br />
water requirement for the project<br />
should also be indicated.<br />
14. Details of water protection and<br />
conservation measures proposed to<br />
be adopted in the project should be<br />
included.<br />
15. Impact of the project on the water<br />
quality both surface and<br />
groundwater should be assessed<br />
and necessary safeguard measures,<br />
if any required should be provided.<br />
16. Details of rainwater harvesting<br />
proposed, if any, in the project to be<br />
provided.<br />
Ambient air quality monitoring and<br />
modeling for cement plant and<br />
CPP is incorporated.<br />
Please refer page nos. 51-63 & 82-<br />
87<br />
No water is required for mining<br />
activities except some water for<br />
wet drilling and for dust<br />
suppression. Treated waste water<br />
from plant area shall be used for<br />
this purpose. No fresh water is<br />
required for the mining activities.<br />
Details of water protection and<br />
conservation measures adopted in<br />
the project are included.<br />
Impact of the project on the water<br />
quality both surface and<br />
groundwater is assessed. No<br />
specific safeguard measures are<br />
required.<br />
Rains are to the tune of 4,000 mm.<br />
Water is available in plenty.<br />
Ground water springs out from<br />
surface, which will be used in plant<br />
and process. Ground water<br />
recharge is not feasible.<br />
<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 12