Hills Cement Co. Limited.<br />

12. Air quality modeling should be<br />

carried out for prediction of impact of<br />

the project on the air quality of the<br />

area. It should also take into account<br />

the impact of movement of vehicles<br />

for transportation of mineral. The<br />

details of the model used and input<br />

parameters used for modeling<br />

should be provided. The air quality<br />

contours may be shown on a<br />

location map clearly indicating the<br />

location of the site, location of<br />

sensitive receptors, if any and the<br />

habitation. The wind roses showing<br />

pre-dominant wind direction may<br />

also be indicated on the map.<br />

13. The water requirement for the<br />

project, its availability and source<br />

along with the permission from the<br />

Competent Authority should be<br />

included. A detailed water balance<br />

should also be provided. Fresh<br />

water requirement for the project<br />

should also be indicated.<br />

14. Details of water protection and<br />

conservation measures proposed to<br />

be adopted in the project should be<br />

included.<br />

15. Impact of the project on the water<br />

quality both surface and<br />

groundwater should be assessed<br />

and necessary safeguard measures,<br />

if any required should be provided.<br />

16. Details of rainwater harvesting<br />

proposed, if any, in the project to be<br />

provided.<br />

Ambient air quality monitoring and<br />

modeling for cement plant and<br />

CPP is incorporated.<br />

Please refer page nos. 51-63 & 82-<br />

87<br />

No water is required for mining<br />

activities except some water for<br />

wet drilling and for dust<br />

suppression. Treated waste water<br />

from plant area shall be used for<br />

this purpose. No fresh water is<br />

required for the mining activities.<br />

Details of water protection and<br />

conservation measures adopted in<br />

the project are included.<br />

Impact of the project on the water<br />

quality both surface and<br />

groundwater is assessed. No<br />

specific safeguard measures are<br />

required.<br />

Rains are to the tune of 4,000 mm.<br />

Water is available in plenty.<br />

Ground water springs out from<br />

surface, which will be used in plant<br />

and process. Ground water<br />

recharge is not feasible.<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 12