Hills Cement Co. Limited.<br />

been made to collect all possible information on land use pattern, socioeconomic<br />

status and other data from various agents and trough public<br />

interviews.<br />

The project plan and the studies already conducted have been considered<br />

and relied upon. The data available have also been utilized to supplement the<br />

data collected by the field study team of the consultants. The anticipated<br />

impacts of the various project activities on the different environmental<br />

parameters have been worked out, by using a checklist method classified as<br />

beneficial or degradational. The ranking of the impact intensity is rather<br />

subjective; the identification of the impact area is sufficiently objective in<br />

nature. The anticipated intensity of impact has been graded as low,<br />

moderate and high.<br />

In the present context, M/S Hills Cement Co. Ltd (HCCL) its is an area of<br />

concern, whose impact is to be evaluated on the existing environmental<br />

domains. The study area has been selected 10 Kms surrounding village<br />

Mynkre (Near 116 km stone on NH-44 Shillong-Silchar Road).<br />

The area has been studied with respect to physiography, topography,<br />

climate, geology and minerals, hydrology and water quality, forest, flora and<br />

fauna, land use and crop pattern, socio-economic aspects and places of<br />

interest etc.<br />

1.7 PRESENT STATUS<br />

The above studies are conducted and assessments made to meet the<br />

requirements specified in the guidelines of the MOEF and or <strong>State</strong> <strong>Pollution</strong><br />

<strong>Control</strong> <strong>Board</strong> as applicable.<br />

The project profile and Terms of Reference for proposed Environmental<br />

Studies were presented before the Hon’ble Expert Committee for appraisal.<br />

The Committee issued following Terms of Reference:<br />

TORs for Cement Plant:<br />

1 Present land use based on satellite imagery. Study area should be<br />

10 km radius.<br />

2 Details of location of wildlife sanctuary and national parks within 10<br />

km radius of the plant should be included.<br />

3 Year-wise availability of resources and future plan for acquiring raw<br />

material from other mines should be incorporated.<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 5