Hills Cement Co. Limited.<br />

“These TORs should be considered for the preparation of draft EIA / EMP<br />

report for the Integrated cement plant (3,000 TPD), Mining Lease (lime<br />

stone 3000 TPD capacity) and coal based Captive Thermal Power Plant (10<br />

MW) near Village Mynkree P.O. Khliehriat, District Jaintia Hills, <strong>Meghalaya</strong><br />

in addition to all the relevant information as per the general structure of EIA<br />

given in Appendix III and IIIA in the EIA Notification, 2006. The draft<br />

EIA/EMP as per TORs should be submitted to the Chairman, <strong>Meghalaya</strong><br />

<strong>State</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong> for public consultation. The <strong>Meghalaya</strong> SPCB<br />

shall conduct the public hearing/public consultation as per the provisions of<br />

EIA notification, 2006.”<br />

Compliance of Terms of Reference (Cement Plant and Power Plant)<br />

S. No. TOR Points Compliance<br />

1 Present land use based on<br />

satellite imagery. Study area<br />

should be 10 km radius.<br />

2 Details of location of wildlife<br />

sanctuary and national parks<br />

within 10 km radius of the plant<br />

should be included.<br />

3 Year-wise availability of resources<br />

and future plan for acquiring raw<br />

material from other mines should<br />

be incorporated.<br />

4 Site-specific micro-meteorological<br />

data including inversion height<br />

and mixing height should be<br />

included.<br />

5 Data on existing air, water, soil &<br />

noise etc. should be included.<br />

6 Ambient air quality monitoring<br />

modeling for cement plant and<br />

CPP (if any) should be<br />

incorporated.<br />

Study area of 10 Kms surrounding<br />

project site is considered. Present<br />

land use based on satellite<br />

imagery is provided.<br />

Please refer page no. 40<br />

There is no wildlife sanctuary and<br />

national parks within 10 Kms<br />

radius of the plant.<br />

Availability of resources and future<br />

plan for acquiring raw material<br />

from other mines is incorporated.<br />

Please refer page no.34-35<br />

Site-specific micro-meteorological<br />

data including inversion height and<br />

mixing height is provided.<br />

Please refer Annexure - I<br />

Data on existing air, water, soil &<br />

noise etc. is included.<br />

Please refer page no.51-69<br />

Ambient air quality monitoring and<br />

modeling for cement plant and<br />

CPP is incorporated.<br />

Please refer page nos. 51-63 &<br />

82-87<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 7