05.07.2015 Views

chapter - 1 introduction - Meghalaya State Pollution Control Board

chapter - 1 introduction - Meghalaya State Pollution Control Board

chapter - 1 introduction - Meghalaya State Pollution Control Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hills Cement Co. Limited.<br />

6. Compressor <strong>Control</strong>s<br />

Start/stop, load/unload, throttling, multi-step, variable speed and<br />

network controls are options for compressor controls and described<br />

below:<br />

• Start/stop (on/off) is the simplest control available and can be applied to<br />

reciprocating or rotary screw compressors. They are used for applications<br />

with very low duty cycles. Applications with frequent cycling will cause the<br />

motor to overheat.<br />

• Load/unload control, or constant speed control, allows the motor to<br />

run continuously but unloads the compressor when the discharge<br />

pressure is adequate. In most cases, unloaded rotary screw compressors<br />

still consume 15 to 35% of full-load power while delivering no useful work.<br />

Hence, load/unload controls can be inefficient.<br />

• Modulating or throttling controls allow the output of a compressor to be<br />

varied to meet flow requirements by closing down the inlet valve and<br />

restricting inlet air to the compressor. Throttling controls are applied to<br />

centrifugal and rotary screw compressors. Changing the compressor<br />

control from on/zero/off to a variable speed control can save up to 8% per<br />

year.<br />

Heat Recovery for Water Preheating<br />

As much as 80 to 93% of the electrical energy used by an Industrial air<br />

compressor is converted into heat. In many cases, a heat recovery unit<br />

can recover 50 to 90% of this available thermal energy for space heating,<br />

industrial process heating, water heating, makeup air heating, boiler<br />

makeup water preheating, industrial drying, industrial cleaning processes,<br />

heat pumps, laundries or preheating aspirated air for oil burners.<br />

7. Lighting<br />

• Lighting <strong>Control</strong>s (manual and automatic controls)<br />

• Replace T-12 Tubes by T-8 Tubes<br />

• Replace Mercury Lights by Metal Halide or High Pressure Sodium Lights<br />

• Replace Metal Halide HID with High-Intensity Fluorescent Lights<br />

• Replace Magnetic Ballasts with Electronic Ballasts<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!