Hills Cement Co. Limited.<br />
The pattern of drilling and blasting has been designed as follows:<br />
Proposed bench height : 6.0m<br />
Proposed diameter of hole : 100 mm,<br />
Effective depth of hole : 7.0m<br />
To maintain good fragmentation<br />
for quick removal of blasted<br />
muck, suggested burden : 3-3.5m<br />
Spacing : 4.0-4.5m<br />
Stemming column : 3.0-3.5m<br />
Tonnage of rock per hole : 236 tonnes.<br />
Impact on stability of slopes<br />
Rock slides in and around the vicinity-<br />
There are no visible signs of rock slides around the vicinity of the mine<br />
and no tension cracks or loosened boulders are present. The mining<br />
activity will have adverse impact on the slope stability, if appropriate<br />
control measures are not adopted. <strong>Control</strong>led blasting shall be adopted<br />
to avoid tension cracks and back breaks. Such crack filled with water<br />
reduces stability of excavated slopes and angle of slopes. Good<br />
drainage shall be provided in and around the quarry.<br />
Rolling boulders<br />
When mining of a bench reaches the edge of the hill, it may give rise to<br />
rolling of boulders downwards along the hill slopes. It may have<br />
adverse impacts on flora and structures on the way. It may also lead to<br />
serious injuries to human beings or animals. Adequate control<br />
measures as given below have been proposed to prevent this<br />
phenoena.<br />
On end bench 8m from the edge is to be considered as “Caution Zone”.<br />
Regular mining shall not be done in the zone. The orientation of the<br />
face will be kept parallel to the edge of the hill in the area and the<br />
bench height is restricted to 2m only. <strong>Control</strong>led blasting will be<br />
adopted for the last blast. Pre-splitting will be done, if required.<br />
<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 78