Hills Cement Co. Limited.<br />

system. The 110 VDC distribution board will cater to the needs of the above<br />

essential auxiliaries loads.<br />

LT & HT Switchgear room<br />

The 11 kV generators switch board (GSB) will also be located within the<br />

power house. The 415 V switchboards and motor control centers (MCC) for<br />

turbo generator, boiler, ESP, Fuel Handling system will be located in ground<br />

floor level. These LT boards will have provision for cable entry from bottom.<br />

All cables within this room will be routed through civil cable trenches.<br />

Adequate exhaust ventilation system will be provided for the switchgear<br />

rooms.<br />

Lightening Protection System<br />

The plant earth grid as well as the turbo generator building-earthing grid will<br />

be interconnected in order to limit the overall resistance of the earthing<br />

system. The design of earthing station will be as per IS: 3043. Galvanized<br />

steel flats will be used for earth mats. All electrical equipment and steel<br />

structure will be earthed properly and distinctly at two points. Separate and<br />

independent earthing connection will be made for electronic equipment in<br />

order to make its functioning free from system disturbances. The entire<br />

power plant buildings/structures at isolated locations will be protected against<br />

lighting. The design of the lightning protection system will be as stipulated in<br />

IS: 2309. The substation earthing system will be provided to keep touch and<br />

step potential within limits. Earthing system consists of earthling station,<br />

earthling conductors and accessories for providing complete earthling to<br />

equipment and system earthing. The Shielding considered for protection of<br />

all outdoor equipment from lighting strokes will be with GS spikes supported<br />

on top of substation structures. Spikes will be connected to the substation<br />

earthing. The lightening arrestors will be outdoor, heavy duty, gapless, ZnO,<br />

non linear resistor, station type with the terminal suitable for outdoor bus<br />

system and earth side terminal suitable for connection with galvanized MS<br />

flats. The nominal discharge current ratings will be 10 kA.<br />

Power monitoring system<br />

Necessary electrical transducers to monitor the parameters such as bus<br />

voltage, current, frequency, power, energy will be provided as part of the<br />

electrical distribution system and these transducers will be wired to the main<br />

DCS unit through remote I/O units for monitoring the power distribution<br />

arrangement. Also contact inputs for various circuit breakers status positions<br />

will be wired to the main DCS unit to monitor the status of the different<br />

distribution breakers and fault condition.<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 28