05.07.2015 Views

chapter - 1 introduction - Meghalaya State Pollution Control Board

chapter - 1 introduction - Meghalaya State Pollution Control Board

chapter - 1 introduction - Meghalaya State Pollution Control Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Hills Cement Co. Limited.<br />

Principle of zero discharge will be adopted and no impermissible<br />

discharge will be allowed out side factory. All water from DM plant will be<br />

used. Blow down water from boiler, auxiliary cooling tower basin, system<br />

leakage water through equipment overflow drain will be managed inside<br />

the cement plant and factory.<br />

4.5 SOLID WASTE<br />

There will be no solid waste generation in the proposed plant. Rejected<br />

materials like packaging material, steel scrap, used tires etc. will be<br />

disposed off. Fly ash generation from CPP shall be handled properly. All<br />

the fly ash will be utilized in cement manufacture.<br />

(C)<br />

ENVIRONMENTAL IMPACTS DUE TO MINING:<br />

Various project activities which may have direct impact on above<br />

environmental parameters are as follows-<br />

A) Land acquisition & site preparation<br />

B) Creation of infrastructure<br />

C) Mining activities<br />

D) Blasting<br />

E) Transportation of mineral and waste rock<br />

F) Stocking of material<br />

G) Waste rock disposal<br />

H) Mine waste disposal<br />

I) Surface transportation and dispatch of mineral<br />

Land degradation, waste rock generation and management<br />

The existing land will be disturbed by the mining operations by three<br />

typesa)<br />

Land degradation caused due to excavation of pits.<br />

b) Land degradation caused due to dumping of waste generated<br />

during mining.<br />

c) Land degradation due to erection of infrastructure facility such<br />

as mines road, site office, rest shelter etc.<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!