05.07.2015 Views

chapter - 1 introduction - Meghalaya State Pollution Control Board

chapter - 1 introduction - Meghalaya State Pollution Control Board

chapter - 1 introduction - Meghalaya State Pollution Control Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hills Cement Co. Limited.<br />

contemplated including action to be<br />

taken by other agencies such as<br />

<strong>State</strong> Govt., if any, should be<br />

covered.<br />

24. Details of the infrastructure facilities<br />

to be provided for the mine workers<br />

should be included.<br />

25. Conceptual post mine land use and<br />

reclamation and rehabilitation of<br />

mined out area (with plans and with<br />

adequate number of sections)<br />

should be included.<br />

26. Slope stability, details of bench<br />

formation and height should be<br />

included.<br />

27. OB contents, Management and<br />

utilization plan, Concurrent<br />

restoration plan.<br />

28. Phase-wise plan of green belt<br />

development as per CPCB<br />

guidelines in 33 % area, plantation<br />

and compensatory afforestation<br />

clearly indicating the area to be<br />

covered under plantation and the<br />

species to be planted. The details of<br />

plantation already done should be<br />

given.<br />

29. Occupational health impact of the<br />

project should be provided.<br />

30. Measures of socio-economic<br />

influence to the local community<br />

proposed to be provided by project<br />

proponent. As far as possible,<br />

quantitative dimension to be given.<br />

31. Detailed environmental management<br />

plan to mitigate the environmental<br />

impacts, which should inter-alia also<br />

include the impact due to change of<br />

site, providing sufficient vegetation<br />

etc. are some of the measures that<br />

would greatly reduce the impacts.<br />

Details of the infrastructure<br />

facilities being provided for the<br />

mine workers. Please refer page<br />

No. 41-42.<br />

Conceptual post mine land use<br />

and reclamation and rehabilitation<br />

of mined out area (with plans and<br />

with adequate number of sections)<br />

shall be submitted later.<br />

Details of bench formation, height<br />

and slope stability included.<br />

OB contents, Management and<br />

utilization plan, Concurrent<br />

restoration plan is given.<br />

Nearly 40% area has been<br />

reserved for green belt<br />

development.<br />

Adequate medical facilities are<br />

being provided to maintain &<br />

periodically check occupational<br />

health of workers.<br />

Please refer page no. 110<br />

Socio-economic development<br />

activities are included.<br />

Please refer page no.101.<br />

EMP includes the concept of waste<br />

minimization,<br />

recycle/reuse/recover techniques,<br />

energy conservation, and natural<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!