Hills Cement Co. Limited.<br />

Raw mix preparation<br />

Pyro-processing<br />

Cement<br />

- Raw material control in quarry<br />

- Raw material control before pre-blending<br />

- Raw material control after raw mill<br />

- Kiln feed<br />

- Fuel<br />

- Clinker<br />

- Before cement mill<br />

- After cement mill<br />

UTILITY SYSTEMS<br />

Compressed Air Supply<br />

The compressed air is required mainly for dust collection equipment and<br />

operation of pneumatic valves. Blowers will be used for aeration of silos. Two<br />

centralized compressor room are proposed, one for the Clinkerisation section<br />

and the other for cement grinding, storage and packing section. Blowers may<br />

be suitably accommodated under buildings / silos near points of utility.<br />

Power<br />

The power requirement for the plant has been estimated as 10 MVA. The<br />

project proponent has a sanction of 10 MW from MeSEB. The power<br />

requirement will also be met by captive power plant.<br />

Water Requirement<br />

Total water requirement for project is expected to be 400 m 3 / day. Some<br />

quantity of water will be required drinking and sanitation for plant personnel.<br />

Total requirement of fresh water make-up including drinking, auxiliary cooling<br />

etc. will be 6-8 M 3 /Hr. Water is available in plenty from nearby underground<br />

natural spring.<br />

Water balance including requirement of water for power plant is given<br />

separately. (Page ref. 32)<br />

Manpower Requirement<br />

Several cement plants are operating in region’s vicinity. Therefore the trained<br />

manpower in marginal, supervisory and skilled categories is expected to be<br />

easily available.<br />

For operation of the power plant and outside service facilities, like coal<br />

handling plant (for AFBC boiler only), ash evacuation system from the ash<br />

silo etc. as well as for day-to-day preventive maintenance of the plant,<br />

necessary manpower has been considered. The estimated number of<br />

technical personnel required is around 450 comprising executives, skilled, a<br />

semi- skilled and unskilled worker. About 150 workers and staff shall be<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 22