05.07.2015 Views

chapter - 1 introduction - Meghalaya State Pollution Control Board

chapter - 1 introduction - Meghalaya State Pollution Control Board

chapter - 1 introduction - Meghalaya State Pollution Control Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hills Cement Co. Limited.<br />

<br />

Table-3.12: Ambient Air Quality Report for AQ1<br />

S.<br />

No.<br />

Station : Mynkre<br />

Month Week Day SPM RSPM 62JP<br />

JP JP 3 ) 12[JP 3 )<br />

3) 3)<br />

06 –<br />

14 hrs<br />

15 - 22<br />

hrs<br />

23 - 06<br />

hrs<br />

24 hrs<br />

Average<br />

06 – 14<br />

hrs<br />

15 - 22<br />

hrs<br />

23 -06<br />

hrs<br />

24 hrs<br />

Average<br />

1. December’ I st 1 st 87 23 5.5 7.8 6.9 7.6 12.9 8.2 10.0 11.5<br />

2007<br />

2.<br />

2 nd 88 29 4.2 7.2 5.5 6.0 10.6 10.1 10.2 8.9<br />

3. IInd 1 st 90 26 6.7 7.8 6.2 7.2 11.3 5.3 9.5 9.9<br />

4.<br />

2 nd 90 21 8.5 6.3 5.1 5.6 10.6 6.0 9.2 8.7<br />

5. IIIrd 1 st 92 32 7.2 6.5 6.5 6.2 11.9 5.8 8.5 9.3<br />

6.<br />

2 nd 98 41 6.3 7.8 7.9 4.5 14.4 6.7 8.8 8.5<br />

7. IVth 1 st 100 18 7.1 3.9 5.6 5.3 10.8 7.8 7.8 9.6<br />

8.<br />

2 nd 107 24 4.7 5.1 8.9 6.9 15.3 5.7 9.1 7.4<br />

1. January’ Ist 1 st 102 24 5.9 4.0 7.9 8.9 11.7 6.9 7.5 9.5<br />

2008<br />

2.<br />

2 nd 100 16 5.0 5.6 6.7 7.0 11.8 7.4 6.4 10.2<br />

3. IInd 1 st 105 32 7.0 5.6 5.5 7.1 10.6 5.4 7.6 9.1<br />

4.<br />

2 nd 98 41 8.2 6.5 5.5 7.7 10.5 8.2 7.6 8.9<br />

5. IIIrd 1 st 102 24 7.0 7.8 7.3 5.7 12.2 10.1 9.4 10.9<br />

6.<br />

2 nd 100 18 7.0 3.9 8.2 4.8 14.7 5.3 12.0 13.3<br />

7. IVth 1 st 96 24 7.4 5.1 10.2 4.6 10.5 9.3 7.6 9.2<br />

8.<br />

2 nd 105 34 4.9 4.0 8.7 9.3 15.1 13.6 11.9 13.5<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 52

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!