10.07.2015 Views

construction and refurbishment of earthen irrigation channel banks

construction and refurbishment of earthen irrigation channel banks

construction and refurbishment of earthen irrigation channel banks

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

16.10.3 Compactor OperationsAfter the type <strong>of</strong> compaction equipment has been selected, it is necessary todetermine the operational procedures to be used for compaction.This involves determining the:• optimum moisture content <strong>of</strong> the soil• action necessary to change the soil’s present moisture content• lift thickness - thickness <strong>of</strong> each layer to be compacted• compactor speed• contact pressure <strong>and</strong> total weight• number <strong>of</strong> passesFor vibratory compactors, the frequency <strong>and</strong> amplitude <strong>of</strong> vibration must also beconsidered.16.11 Moisture Content Control Tests <strong>and</strong> ProceduresMoisture content control is critical in achieving adequate compaction.Moisture Content Control occurs in four steps:1. Determine Optimum Moisture Content2. Determine Field Moisture Content3. Determine Moisture Variation4. Check moisture content conforms with the specification16.11.1 Determine Optimum Moisture ContentThe moisture content <strong>of</strong> the material being compacted should be controlled at or asnear as possible to the Optimum Moisture Content to achieve the highest density forthe compaction effect. Refer Section 16.12.1.Optimum moisture content for compaction depends not only on the type <strong>of</strong> soil, butalso on the type <strong>and</strong> weight <strong>of</strong> compaction equipment used. For most <strong>channel</strong> bankprojects, it is practical to assume that the st<strong>and</strong>ard laboratory compactive effectreasonably duplicates the field compactive effort <strong>and</strong> vice versa. Perfectly correctvalues <strong>of</strong> maximum density <strong>and</strong> optimum moisture content can be determined onlyby setting up field test sections using the chosen compaction equipment. This issometimes done on large earthworks projects, but is rarely justified on most<strong>channel</strong> bank projects.Construction <strong>and</strong> Refurbishment <strong>of</strong> Earthen Channel Banks August 2002 - Edition 1.0 16-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!