10.07.2015 Views

construction and refurbishment of earthen irrigation channel banks

construction and refurbishment of earthen irrigation channel banks

construction and refurbishment of earthen irrigation channel banks

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Aim for crest width <strong>of</strong>about 2 metres on smaller<strong>channel</strong>sClay CoreMaterialEroded BankMaterial(EBM)Inside batterstabilisationwith EBMFigure 20.12Core filled with EBMThe success <strong>of</strong> core trenching is heavily dependent on the technique <strong>and</strong> thematerial used. Use <strong>of</strong> saturated EBM from the waterway should be avoided. ReferPhoto 20-8. The EBM should be let dry as much as possible. Also all vegetation<strong>and</strong> organic material should be removed from the EBM before placing in core.Photos\<strong>refurbishment</strong>\Cohuna <strong>channel</strong>sEBM7.jpgPhoto 20-8Saturated material used to fill core. On drying core cracks <strong>and</strong>becomes crumblyPhotos\<strong>refurbishment</strong>\Cohuna <strong>channel</strong>sEBM6.jpgPhoto 20-9Cut through <strong>channel</strong> bank showing original compacted bank with layer<strong>of</strong> silt placed over the top20.5.3 Case StudyThe Torrumbarry 3/1 <strong>and</strong> 16/1 <strong>channel</strong>s were rehabilitated during 1997 in thefollowing manner:• <strong>channel</strong>s were selected according to the availability <strong>of</strong> EBM• already had enough freeboard so that any works would not bring this belownormal operating ranges.• Channel was drained. When water level had dropped, the topsoil was stripped<strong>and</strong> stockpiled.• Any hollows encountered in the batter were filled with good clay fill• Eroded <strong>channel</strong> material was pulled up from the bottom <strong>of</strong> the <strong>channel</strong> onto theinside batter <strong>and</strong> crest <strong>of</strong> the <strong>channel</strong> bank. The material placed on the crest wassurplus.• In some locations the crest <strong>of</strong> the <strong>banks</strong> was later rotary-hoed as cracks up to40cm in depth formed in the EBM material as soon as it dried out.Construction <strong>and</strong> Refurbishment <strong>of</strong> Earthen Channel Banks August 2002 - Edition 1.0 20-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!