- Page 4 and 5: ForwardAustralia’s irrigation ass
- Page 6 and 7: AbstractThe need to reduce the life
- Page 8 and 9: State Irrigation Authority AreaVict
- Page 10 and 11: Amendment ListAmendmentNumberIssueD
- Page 12 and 13: Book 2 - SpecificationsSpecificatio
- Page 14 and 15: Earthen Channel practices of proven
- Page 16 and 17: 2. Background to these GuidelinesTh
- Page 18 and 19: 4. establishment of a network of ke
- Page 20 and 21: 5. AcronymsDNREG-MWLWRRDCQDNRSCADAS
- Page 22 and 23: 7. SymbolsABCaCECDECareabed width (
- Page 24 and 25: authorities for the ANCID Seepage P
- Page 26 and 27: 9. Channel Bank LivesTable of Conte
- Page 28 and 29: New ChannelEnd of LifeFigure 9.1Typ
- Page 30 and 31: • amount of vegetation and weed g
- Page 32 and 33: Cost$Initial Construction CostRehab
- Page 34 and 35: • Rehabilitate - During this phas
- Page 36 and 37: 10 Channel Bank DeteriorationTable
- Page 38 and 39: 10.1 Causes of Channel Bank Deterio
- Page 40 and 41: Government schemes generally have a
- Page 42 and 43: Also the channel water chemistry wi
- Page 44 and 45: • encourages weed growth which ca
- Page 46 and 47: This is primarily a structure issue
- Page 48 and 49: 10.1.6.5 Adjacent treesTrees can ha
- Page 50 and 51: 10.1.7.2 FencingFencing is recommen
- Page 52:
10.1.9 EnvironmentEnvironmental det
- Page 55 and 56:
These shrinkage cracks develop in a
- Page 57 and 58:
Figure 10.11Piping through bankThe
- Page 59 and 60:
10.2.4 TunnellingAn investigation f
- Page 61 and 62:
11. Planning and InvestigationTable
- Page 63 and 64:
emedial works that might be require
- Page 65 and 66:
12. Earthen Channel DesignTable of
- Page 67 and 68:
12.1 IntroductionOperation and main
- Page 69 and 70:
The detailed design issues include
- Page 71 and 72:
A range of factors influence the de
- Page 73 and 74:
) Low density or potentially collap
- Page 75 and 76:
In channels, steady flow may be uni
- Page 77 and 78:
The product of the velocity and are
- Page 79 and 80:
Table 12-4 sets out a systematic me
- Page 81 and 82:
Higher velocities can be permissibl
- Page 83 and 84:
The type of rock beaching (sized gr
- Page 85 and 86:
Figure 12-4 illustrates the princip
- Page 87 and 88:
Where the bank level is based on th
- Page 89 and 90:
Settlement due to material consolid
- Page 91 and 92:
The mechanics of wave generation ar
- Page 93 and 94:
2. This table is for a channel 1.5
- Page 95 and 96:
- risk allowance- wave setup (S)- h
- Page 97 and 98:
Numerous criteria are used by irrig
- Page 99 and 100:
The water section must be able to c
- Page 101 and 102:
Close attention needs to be paid to
- Page 103 and 104:
height required to ensure that the
- Page 105 and 106:
In serious cases, a large section o
- Page 107 and 108:
The general equation for a parabola
- Page 109 and 110:
In new channel construction, if the
- Page 111 and 112:
The side of the channel selected fo
- Page 113 and 114:
Tight specifications and constructi
- Page 115 and 116:
• The authority cannot enforce fe
- Page 117 and 118:
13/08/02 19:20However, fencing of c
- Page 119 and 120:
13/08/02 19:20The asset protection
- Page 121 and 122:
13/08/02 19:20The disadvantages of
- Page 123 and 124:
13/08/02 19:20Fence TypeDescription
- Page 125 and 126:
13/08/02 19:2012.23 Design Drawings
- Page 127 and 128:
13/08/02 19:2012.25 ReferencesBrate
- Page 129 and 130:
13. Life Cycle Cost AnalysisTable o
- Page 131 and 132:
InvestigationDesignConstructionOper
- Page 133 and 134:
New ConditionAssetConditionRehabili
- Page 135 and 136:
CashFlowInvestigation,DesignConstru
- Page 137 and 138:
Develop Analysis PlanSee Section 13
- Page 139 and 140:
in some cases to compare all the op
- Page 141 and 142:
• engineering assessment• profe
- Page 143 and 144:
Timing of costs is important as ear
- Page 145 and 146:
Life CyclePhaseConstruction(cont)Op
- Page 147 and 148:
ConsultationSurvey and set outLife
- Page 149 and 150:
Wet weather and climatic risksRisks
- Page 151 and 152:
It is known that maintenance costs
- Page 153 and 154:
than the general cost inflation. It
- Page 155 and 156:
The life-cycle cost outputs should
- Page 157 and 158:
Life Cycle Cost AnalysisAlternative
- Page 159 and 160:
13.7 ReferencesAssociation of Local
- Page 161 and 162:
14.1 IntroductionBefore commencing
- Page 163 and 164:
HIGHHConsequences of FailureMMEDIUM
- Page 165 and 166:
15.1 IntroductionChannel banks can
- Page 167 and 168:
Photo 15-1Excavator at borrow pitTh
- Page 169 and 170:
GOULBURN-MURRAY WATER SOILS LABORAT
- Page 171 and 172:
The Unified Soil Classification sys
- Page 173 and 174:
COARSE-GRAINEDSOILSMore thanhalf of
- Page 175 and 176:
15.5 ShrinkageProper boundary class
- Page 177 and 178:
There is a tendency for certain cla
- Page 179 and 180:
composition of water for the irriga
- Page 181 and 182:
optimum moisture content. (Optimum
- Page 183 and 184:
For these limits no special treatme
- Page 185 and 186:
15.9.2 ShrinkageFat clays (expansiv
- Page 187 and 188:
It is generally not practical to se
- Page 189 and 190:
composition of fly ash varies consi
- Page 191 and 192:
Hand-Rolling testClassification of
- Page 193 and 194:
lose some moisture by evaporation.
- Page 195 and 196:
15.12 Australian StandardsAS1726-19
- Page 197 and 198:
16.12.3.1 Normal Method ...........
- Page 199 and 200:
• Increased stability - The maxim
- Page 201 and 202:
Dry Densityof SoilMaximumDryDensity
- Page 203 and 204:
As a general guide the thickness of
- Page 205 and 206:
If the number of compaction passes
- Page 207 and 208:
Tight specifications and constructi
- Page 209 and 210:
Tests indicate little change in den
- Page 211 and 212:
Photos\construction\cg9 dozer sprea
- Page 213 and 214:
16.11.2 Determine field moisture co
- Page 215 and 216:
16.11.4.1 Increasing Water ContentI
- Page 217 and 218:
There are two forms of this test: S
- Page 219 and 220:
Table 16-2 Comparison of Field Dens
- Page 221 and 222:
The Hilf Density Ratio = Field Wet
- Page 223 and 224:
AdvantagesCost - instrument relativ
- Page 225 and 226:
Type of EarthworksType Description1
- Page 227 and 228:
16.15 Acceptance of Test ResultsThe
- Page 229 and 230:
With small projects it may be appro
- Page 231 and 232:
16.17 Australian StandardsAS1289.2.
- Page 233 and 234:
16.18 ReferencesCummins PJ (1984),
- Page 235 and 236:
17.1 IntroductionIt is important th
- Page 237 and 238:
ProtectiveCoverMaterialGravel Refer
- Page 239 and 240:
Coarse grained sand is recommended
- Page 241 and 242:
Vegetation to be encouraged on chan
- Page 243 and 244:
17.6.4 Issues to consider before ve
- Page 245 and 246:
Process Application Advantages Disa
- Page 247 and 248:
YesIs Channel Bankused as AccessLay
- Page 249 and 250:
18. Inside Batter TreatmentTable of
- Page 251 and 252:
ErodedchannelprofileBankundercutBot
- Page 253 and 254:
erodedchannelprofileReinstatementof
- Page 255 and 256:
Depending on the material suitabili
- Page 257 and 258:
Smooth or grounded gravel will have
- Page 259 and 260:
18.4.1.6 Use of GeotextileA geotext
- Page 261 and 262:
With the velocities encountered in
- Page 263 and 264:
18.5 VegetationVegetation of the ri
- Page 265 and 266:
18.5.2 Decision Making CriteriaThe
- Page 267 and 268:
19. Channel Bank ConstructionTable
- Page 269 and 270:
19.1 IntroductionThis section sets
- Page 271 and 272:
RD 246BoundaryCentrelineBoundaryTan
- Page 273 and 274:
Red - all reference pegs and stakes
- Page 275 and 276:
Construction and Refurbishment of E
- Page 277 and 278:
19.5 Site Preparation19.5.1 Clearin
- Page 279 and 280:
A hydraulic excavator working along
- Page 281 and 282:
When a cubic metre of material is c
- Page 283 and 284:
worked until the specified results
- Page 285 and 286:
19.6.8 Batter slopescompaction. Re-
- Page 287 and 288:
19.9 Final check surveyWhen constru
- Page 289 and 290:
19.18 Site RestorationRestoration o
- Page 291 and 292:
20. Channel Bank RefurbishmentTable
- Page 293 and 294:
2. Cost to Authority• high operat
- Page 295 and 296:
•outfalls•proximity to urban de
- Page 297 and 298:
20.3.1.2 SurveysSurvey is required
- Page 299 and 300:
channels are operating and so avoid
- Page 301 and 302:
20.4.1.2 ExcavationExcavation may c
- Page 303 and 304:
Existing siltto be removed3000Prote
- Page 305 and 306:
For economic construction, borrow m
- Page 307 and 308:
ank and the crest. The EBM then act
- Page 309 and 310:
anks. The typical process of bank r
- Page 311 and 312:
PhotosPyramid Hill Channel 16/1 bef
- Page 313 and 314:
21. Channel SeepageTable of Content
- Page 315 and 316:
21.1 IntroductionBecause earthen ir
- Page 317 and 318:
Since many of these factors are clo
- Page 319 and 320:
21.3.1 PermeabilityA high permeabil
- Page 321 and 322:
In the case where the groundwater i
- Page 323 and 324:
Where a channel has relatively high
- Page 325 and 326:
The second measurement unit is comm
- Page 327 and 328:
Soil permeability can be measured i
- Page 329 and 330:
21.6.1.3 Laboratory methods of meas
- Page 331 and 332:
• the degree of saturation of the
- Page 333 and 334:
A reliable groundwater process mode
- Page 335 and 336:
In high watertable areas even a sma
- Page 337 and 338:
Indirect measurements is based on a
- Page 339 and 340:
• Changing inflows and outflows,
- Page 341 and 342:
• Skilled hydrographers are requi
- Page 343 and 344:
• Wave action and channel level c
- Page 345 and 346:
Once the relationship between chann
- Page 347 and 348:
Each of these methods has its inher
- Page 349 and 350:
High energy impact rollers are able
- Page 351 and 352:
Groundwater interception is effecti
- Page 353 and 354:
21.10 Further ResearchIn October 19
- Page 355 and 356:
21.10.4 Further InformationFurther
- Page 357 and 358:
Kishel J (1993), Lining the All-Ame
- Page 359 and 360:
22.8.1 Description ................
- Page 361 and 362:
United States references give a wid
- Page 363 and 364:
In view of the high cost, decisions
- Page 365 and 366:
around the world are typically 20 t
- Page 367 and 368:
22.4.2 Soil Waterlogging and Salini
- Page 369 and 370:
Earthen linings and buried geomembr
- Page 371 and 372:
• Channel size and importance•
- Page 373 and 374:
In many Australian irrigation schem
- Page 375 and 376:
However, the cost of more imperviou
- Page 377 and 378:
Careful consideration of the future
- Page 379 and 380:
Construction and Refurbishment of E
- Page 381 and 382:
Construction and Refurbishment of E
- Page 383 and 384:
The suitability of materials for ea
- Page 385 and 386:
These thicknesses point to one of t
- Page 387 and 388:
Refer to Section 16, Compaction Con
- Page 389 and 390:
can be difficult to distinguish bet
- Page 391 and 392:
damage in a channel situation and a
- Page 393 and 394:
3. When the required final water co
- Page 395 and 396:
viable alternative or the use of so
- Page 397 and 398:
22.8 Flexible Membrane Linings22.8.
- Page 399 and 400:
Potential fire damage is another is
- Page 401 and 402:
Table 22-6 Flexible Membrane Liner
- Page 403 and 404:
PVC is very flexible, easy to handl
- Page 405 and 406:
GCL’s have the advantage of relat
- Page 407 and 408:
during construction and initial use
- Page 409 and 410:
Figure 22.7Multiaxial Burst22.8.4.2
- Page 411 and 412:
the length of the channel rather th
- Page 413 and 414:
Edge fixing and adequate freeboard
- Page 415 and 416:
product can be used successfully in
- Page 417 and 418:
Generally the native soil subgrade
- Page 419 and 420:
The use of a parabolic section for
- Page 421 and 422:
The thickness of the earth cover fo
- Page 423 and 424:
Some lining materials expand and co
- Page 425 and 426:
Whether or not a covered geomembran
- Page 427 and 428:
Row D (2000), District Engineer - B
- Page 429 and 430:
23.6.1.1 Draining of Channels......
- Page 431 and 432:
Deterioration FactorInvestigation&
- Page 433 and 434:
23.2 Reduction of Deterioration - C
- Page 435 and 436:
Unless the inside batters are prote
- Page 437 and 438:
ErosionRillingWave ActionCarp Actio
- Page 439 and 440:
In as much as uncorrected minor mai
- Page 441 and 442:
Where sufficient bank width exists,
- Page 443 and 444:
Channel operation and maintenance a
- Page 445 and 446:
were in decline before carp became
- Page 447 and 448:
Female carp mature at 2-4 years and
- Page 449 and 450:
Electro-fishing is generally not co
- Page 451 and 452:
23.5.8.2 Electrical BarriersElectri
- Page 453 and 454:
23.5.11 Strategy to prevent damage
- Page 455 and 456:
and operating procedures designed t
- Page 457 and 458:
Yabbies are omnivorous but primaril
- Page 459 and 460:
• Good access to bank required•
- Page 461 and 462:
• native to the area where possib
- Page 463 and 464:
23.8 ReferencesAgriculture, Fisheri
- Page 465 and 466:
24. Glossaryabsorption sorption int
- Page 467 and 468:
oughness factor. In each case, this
- Page 469 and 470:
unit hydraulic gradient and has the
- Page 471 and 472:
• repeated wetting and drying of