10.07.2015 Views

construction and refurbishment of earthen irrigation channel banks

construction and refurbishment of earthen irrigation channel banks

construction and refurbishment of earthen irrigation channel banks

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cost$Initial Construction CostRehabilitation CostMaintenanceCostMaintenanceCostMaintenanceCostTime (Years)Figure 9.2Life-cycle cost streamAssetConditionRating orIndex12New Condition3456Minimum Acceptable Level10% 20% 30% 40% 50% 60% 70% 80% 90% 100%Percentage EffectiveLife (%)Figure 9.3Goulburn-Murray Water Channel Decay Curve9.1.2 Development <strong>of</strong> Optimal Intervention StrategiesA <strong>channel</strong> will pass through a number <strong>of</strong> phases during its life cycle, <strong>and</strong> theseprovide opportunities for intervention, which along with maintenance may includerehabilitation <strong>and</strong> replacement. There will be specific timings <strong>and</strong> costs associatedwith each <strong>of</strong> these actions. This is illustrated in Figure 9.5, a typical asset decaycurve.Construction <strong>and</strong> Refurbishment <strong>of</strong> Earthen Channel Banks August 2002 - Edition 1.0 9-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!