10.07.2015 Views

construction and refurbishment of earthen irrigation channel banks

construction and refurbishment of earthen irrigation channel banks

construction and refurbishment of earthen irrigation channel banks

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ank <strong>and</strong> the crest. The EBM then acts to stabilise the inside batter face <strong>and</strong>increase freeboard, if required.Non-coring methods <strong>of</strong> repair increase the bank width by re-forming the bank withEBM while leaving the bank’s core intact.This method is illustrated in Figure 20.10.Bank re-forming with EBM is typically carried out as follows:1. <strong>channel</strong>s are selected for bank re-forming according to the suitability <strong>and</strong>availability <strong>of</strong> EBM.2. the <strong>channel</strong> is drained <strong>and</strong> the EBM is de-watered as much as possible.3. topsoil is stripped from crest <strong>and</strong> stockpiled4. any hollows encountered in the inside batter are filled with good clay fill, ifavailable5. EBM is excavated from the bottom <strong>of</strong> the <strong>channel</strong> <strong>and</strong> placed onto the insidebatter <strong>and</strong> crest <strong>of</strong> bank, then shaped so that the inside batter is at a maximumslope <strong>of</strong> 1:3 <strong>and</strong> the crest is restored to a trafficable width.Re-establish freeboardInside batterstabilisationwith EBMThe top <strong>of</strong> the originalbank is not pulleddown below runninglevel <strong>of</strong> <strong>channel</strong>31Some material is left inthe bed <strong>of</strong> the <strong>channel</strong>as a sealFigure 20.10Pr<strong>of</strong>ile after EBM Stabilisation6. Material is left to dry7. Crest <strong>of</strong> bank is rotary-hoed8. The crest is shaped <strong>and</strong> trimmed with a bulldozer or grader.9. Protective cover (refer Section 17) replaced on crest (if no access) <strong>and</strong> outsidebatter.10. A layer <strong>of</strong> protective granular material is placed on the waterface if required.11. Access track is constructed.12. Longitudinal fencing is installed if protection is required.Limitations <strong>of</strong> method• Need to use with a degree <strong>of</strong> caution. G-MW has found, depending on suitability<strong>of</strong> EBM, <strong>and</strong> the deterioration conditions acting on the bank, that the life <strong>of</strong> thebank may be extended by 10-15 years. However the life extensions have variedConstruction <strong>and</strong> Refurbishment <strong>of</strong> Earthen Channel Banks August 2002 - Edition 1.0 20-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!