11.07.2015 Views

Highway Maintenance Response Time Standards

Highway Maintenance Response Time Standards

Highway Maintenance Response Time Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TPW - Winter <strong>Maintenance</strong> <strong>Standards</strong>RO90 - 104/105/106 Snow and Ice ControlNova Scotia Winter <strong>Maintenance</strong> <strong>Standards</strong>••••••••••••••••104/105/106 SNOW AND ICE CONTROLGENERAL1. The Operations Supervisor is responsible for ensuring that highways are maintained inaccordance with these Winter <strong>Maintenance</strong> <strong>Standards</strong>.2. These Winter <strong>Maintenance</strong> <strong>Standards</strong> establish levels of service on Provincial <strong>Highway</strong>s.The following winter maintenance levels of service for snow and ice control are based onroad classification and traffic volumes:Levels of Service TableLEVEL OFSERVICE Level 1A Level 1B Level 2 Level 3 Level 4Type ofRoads-All 100 Seriesand-Selected highvolumehighways-All Trunksand-Selectedhighways asper AADTlimits-All Routesand-Selectedhighways asper AADTlimits-All LocalRoads-All GravelRoadsAADT Limits > 7,500 7,500 - 4,000 4,000 - 1,500 < 1,500Winter Levels of Service DescriptionsClassification1A1BDescriptionEssentially Bare PavementEssentially Bare Pavement2 Centre Line Bare 2.5m to 5.0m3 Centre Line Bare 1.5m to 2.5mDecember 1, 2001

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!