FIELD OPERATIONS MANUALOPERATIONS PROCEDURESJuly 2001 PROCEDURE No. 4Page 2 of 25. Each district and/or subdistrict is encouraged to establish communication with all appropriate police agencies in order toassure prompt notification of damages. In addition, the subdistrict shall review their roads on a periodic basis (at leastonce a year). The guardrail shall be reviewed for damage, deterioration, and breaks in the continuity of the guardrail. Alist of locations needed attention, beyond the capabilities of the subdistrict, will be submitted to the district for appropriateaction.COMMENTSIn step No. 4 the designated guardrail specialist should be trained in the criteria of the guardrail repair policy, the latest designcriteria and be capable of giving directions and assistance to the subdistricts in this activity. In districts that have any openended guardrail repair contract, the assigned Project Engineer/Supervisor should be knowledgeable of the latest in guardraildesign and installation.In step No. 5 the periodic examination is intended to be at least once a year preferable twice a year. Deteriorated guardrailmeans that the present installation is not functioning as it was originally designed.APPROVED:_______________________________8-24-98Timothy D. Bertram, ChiefDateOperation Support Division

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!