11.07.2015 Views

Highway Maintenance Response Time Standards

Highway Maintenance Response Time Standards

Highway Maintenance Response Time Standards

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFTGuide railPreventive <strong>Maintenance</strong>Design Modification(Corrective) <strong>Maintenance</strong>2 yearsee guidanceReplacement CycleOverhead Sign Structures Preventive <strong>Maintenance</strong>5% of total system everyyearAnnuallySigns 2(Ground mounted)Pavement Markings 2(Paint only)Lighting 5<strong>Response</strong> <strong>Maintenance</strong>RepairDesign Modification(Corrective) <strong>Maintenance</strong>ReplacePreventive <strong>Maintenance</strong><strong>Response</strong> <strong>Maintenance</strong>Design Modification(Corrective) <strong>Maintenance</strong>see guidanceAs conditions warrant12 yr replacement cycleAnnuallyAnnuallysee guidanceAs conditions warrant1 Total resurfacings should result in a 12 year paving cycle. Single-course overlays should not exceed70% of total resurfacings.2 Currently fully funded out of TMD operating budget.5 Currently funded through TE&HS Divisions operating budget.OPERATIONSSignal <strong>Maintenance</strong> and Operations GuidanceThe Department is responsible for the maintenance and operation of over 6000 signalsstatewide. Signals should be inspected annually including signal installations, testing ofcontrollers/detectors, a check of head vertical clearance, and replacing bulbs (non-LEDsites).Design modification (corrective) maintenance includes periodic replacement of signalcomponents such as heads, loops, and controller replacement/repairs. This may also13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!