11.07.2015 Views

Highway Maintenance Response Time Standards

Highway Maintenance Response Time Standards

Highway Maintenance Response Time Standards

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFTintegration, configuration management, software upgrades, network support, etc.These activities are often included in ITS operations contracts.Preventive, response and design modification (corrective) maintenance activities arelargely focused on field infrastructure (ITS devices and systems) which includesreplacement of existing systems as they reach their useful physical or technical life.This would also include any consultant effort related to engineering support to assessthe impacts of projects on the existing system or to design planned replacement of thesystem.ITS devices included are 2070 controllers, loop detectors, video image detectors/closedcircuit television (CCTV), ramp meters, variable message signs (VMS), high accuracyradio (HAR), wireline, wireless equipment, computer hardware, and computersoftware/integration. Specific replacement cycles may be found in Table 2. Equipmentfailures should be replaced in accordance with Regional <strong>Response</strong> Policy.Another consideration for signals and Intelligent Transportation Systems is life cyclereplacement costs. The service life for signals and ITS equipment and systems need tobe considered carefully. These life cycles are likely to be shorter than for otherinfrastructure (i.e. pavements or bridges) due to changes in technology or improvedsoftware/automation systems.16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!