Maryland DOTDraft1/28/03Revised <strong>Response</strong> GuidelinesAfter Hours Signal Emergencies and MalfunctionsAfter normal working hours response to traffic control signal, intersection control beacon and warning beaconemergencies and malfunctions will be performed in the following manner:• Traffic control signal timing calls will be verified via remote computer reporting capability, if available.-- If verified, the traffic control signal will be placed on fixed time operation until the next regular shift.This next regular shift will subsequently respond on-site to perform any needed repairs.-- If unable to verify, immediate on-site response will perform any needed repairs.-- If repairs require contractual assistance, these repairs will be scheduled at the earliest possible datethrough bidding or area-wide contracts.• On flashing operation calls will not be responded upon from 12 a.m. until 6 a.m.-- Calls received on Monday through Friday will be responded to on-site by the next regular shift toperform any needed repairs.-- Calls received on either Sunday or Saturday will be responded on-site by beeper personnel from 6 a.m. to12 a.m.• Lamp outage calls will not be responded upon from Monday to Friday, 12 a.m. until 6 a.m., and all day onSunday and Saturday.• Complete outage calls received will be verified via remote computer reporting capability, if available.-- If verified, immediate response will be made on-site to perform any needed repairs.-- If unable to verify, police will be requested to verify the call before any response on-site to perform anyneeded repairs.• Cabinet knockdowns will be placed back into full color operation. Ancillary repairs to detection andinterconnection may be accomplished by the end of next regular shift.-- If repairs require contractual assistance, these repairs will be scheduled at the earliest possible datethrough bidding or area-wide contracts.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!