11.07.2015 Views

Highway Maintenance Response Time Standards

Highway Maintenance Response Time Standards

Highway Maintenance Response Time Standards

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFTTable 2 Target Operations <strong>Maintenance</strong> ActivitiesActivitySignals Preventive <strong>Maintenance</strong> 3AnnuallyCycleIntelligent TransportationSystems 4<strong>Response</strong> <strong>Maintenance</strong> 3Design modification(Corrective) <strong>Maintenance</strong> Loop Replacement 3 2070 Conversion 3 LED Conversion 3 15 yr SignalEquipmentreplacement cycle 25 yr Polereplacement cyclePreventive <strong>Maintenance</strong><strong>Response</strong> <strong>Maintenance</strong>Design Modification(Corrective) <strong>Maintenance</strong>Loop DetectorsVideo Image detectors/CCTVRamp MetersVMS (permanent)HARWirelineComputer HardwareComputer Software/IntegrationOperations 3see guidancesee guidance As warranted Convert over 10 years As soon as practical 7% of total systemreplacement/year (400) 4% of total systemreplacement/year (240)AnnuallySee guidanceSee guidance5 yr10 yr5 yr20 yr20 yr20 yr5 yr5 – 20 yearsAs conditions warrant3 This activity is currently funded through TE&HS operating budget as well as capital funds.4 Estimated Service Life for key ITS Freeway Management System Components as presented inUSDOT’s Freeway Management Handbook, 1997.Program Update Instructions: August, 200417

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!