12.07.2015 Views

Implementation in Europe in Electrical and ... - tuning project

Implementation in Europe in Electrical and ... - tuning project

Implementation in Europe in Electrical and ... - tuning project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIE-Surveyor3.1.73.1.7.1 At the beg<strong>in</strong>n<strong>in</strong>g of the doctoral studies?3.1.7.2 After a specified period of coursework?3.1.7.3Other. Please specify:3.1.83.1.8.1 Any professor or lecturer <strong>in</strong> the department?3.1.8.2 Any researcher <strong>in</strong> the department?3.1.8.2.1 In this case, is there a need for a second supervisor who is aprofessor or lecturer <strong>in</strong> the department?3.1.8.3 Any researcher <strong>in</strong> another <strong>in</strong>stitution?3.1.8.3.1 In the latter case, is there a need for an <strong>in</strong>ternal supervisor?3.1.8.4Other methods. Please specify:3.1.93.1.9.1 Agreement between the student <strong>and</strong> the proposed supervisor?3.1.9.2Other methods. Please specify:3.2.1 Do the students have to take coursework dur<strong>in</strong>g their doctoral degreepreparation? If no, please proceed to 3.3.3.2.23.2.2.1 What is the number of contact hours spent <strong>in</strong>coursework <strong>in</strong> each year?Year 1 Year 2 Year 312h/weekO hrs0 hrs- 395 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!