12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Environmental Plansbenefits of roots and the incorporation of plant material. Further, the incorporated plant materialgenerally includes native seeds and plants as well as microorganisms which can accelerate theestablishment of native vegetation when used as a cover.Wet soils have poor stability. They may require temporary berming to allow for them to drainsufficiently to be stockpiled.9.2.3 Monitoring and ReportingPost closure monitoring will be conducted in the Mine Site area, along the road, at streamcrossings, quarry sites and the port area to ensure closure and associated reclamation effortsremain effective in the longer term. Post closure monitoring will include, but not be limited to:• soil erosion monitoring;• revegetation success;• terrestrial habitat use; and• water quality and possibly quantity in water courses adjacent to or downstream ofdecommissioning and reclamation activity, according to parameters and guidelinesagreed by <strong>NIRB</strong> and the Nunavut Water Board.Monitoring and reporting will be performed as required in the final Closure and ReclamationPlan as approved by <strong>NIRB</strong>, INAC, the Nunavut Water Board and other regulatory agencies.January 2008 <strong>Hackett</strong> <strong>River</strong> <strong>Project</strong> – <strong>Project</strong> <strong>Proposal</strong> <strong>Sabina</strong> Silver CorporationReport Version B.1 9–6 Rescan Environmental Services Ltd. (Proj. #833-2)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!