12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Project</strong> Specific Information RequirementA-2 All-Weather Road/Access TrailSection in <strong>Project</strong><strong>Proposal</strong> Report10 Identify the proposed traffic speed and measures employed to ensure public safety. Road safety and wildlifesafety plans will be includedin the draft EIS11 Describe dust management procedures. A dust management plan willbe included in the draft EISA-3 Winter Road/Trail N/A12 Describe the surface preparation, including the use of snow berms or compaction,N/Aand any flooding. If flooding is to be used, provide the location of the water sourceon a map.13 Describe the operating time period. N/A14 Identify the proposed traffic speed and measures employed to ensure public safety. N/A15 Discuss whether the selected route traverses any fish-bearing water bodies. N/ASection B: Mineral Exploration /Advanced Exploration / DevelopmentN/AB-1 <strong>Project</strong> Information N/A1 Describe the type of mineral resource under exploration. Section 2.1.2, Section 2.4.1B-2 Exploration Activity2 Indicate the type of exploration activity:• Bulk Sampling (underground or other)• Stripping (mining shallow bedded mineral deposits in which the overlyingmaterial is stripped off, the mineral removed and the overburden replaced)• Trenching• Pitting• Delineation drilling• Preliminary Delineation drilling• Exploration drilling• Geophysical work (indicate ground and/or air)• Other3 Describe the exploration activities associated with this project:• Satellite remote sensing• Aircraft remote sensing• Soil sampling• Sediment sampling• On land drilling (indicate drill type)• On ice drilling (indicate drill type)• Water based drilling (indicate drill type)• Overburden removal• Explosives transportation and storage• Work within navigable waters• On site sample processing• Off site sample processing• Waste rock storage• Ore storage• Tailings disposal• Portal and underground ramp construction• Landfilling• Landfarming• OtherDelineation drilling (

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!