12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Project</strong> Specific Information RequirementSocioeconomic Environment• Palaeontological component of surface and bedrock geology. Section 6.3.3• Land and resource use in the area, including subsistence harvesting, tourism, Section 6.3.4trapping and guiding operations.• Local and regional traffic patterns. Section 6.3.5• Human Health, broadly defined as a complete state of wellbeing (including physical, Section 6.3.7social, psychological, and spiritual aspects).• Other Valued Socioeconomic Components (VSEC) as determined throughSection 6.3.8community consultation and/or literature review.Identification of Impacts and Proposed Mitigation Measures1 Please complete the attached Table 1 – Identification of Environmental Impacts,taking into consideration the components in Appendix A. Identify impacts in Table1 as either positive (P), negative and mitigable (M), negative and non- mitigable(N), or unknown (U).Section in <strong>Project</strong><strong>Proposal</strong> ReportCompleted and included inSection 7.22 Discuss the impacts identified in the above table. Sections 7.3.1, 7.3.2, 7.3.33 Discuss potential socioeconomic impacts, including human health. Section 7.3.44 Discuss potential for transboundary effects related to the project. Section 7.3.55 Identify any potentially adverse effects of the project proposal on species listed Sections 6.2.10, 7.3.2, 7.3.3under the Species at Risk Act (SARA) and their critical habitats or residences, whatmeasures will be taken to avoid or lessen those effects and how the effects will bemonitored.6 Discuss proposed measures to mitigate all identified negative impacts. Sections 7.3.1, 7.3.2, 7.3.3,7.3.4Cumulative EffectsDiscuss how the effects of this project interact with the effects of relevant past, present Chapter 8and reasonably foreseeable projects in a regional context.Supporting Documents• Abandonment and Decommissioning Plan Addressed in Chapter 9;draft plan will be included indraft EIS• Existing site photos with descriptions Appendix B• Emergency Response Plan Addressed in Chapter 9;draft plan will be included indraft EIS• Comprehensive Spill Prevention/Plan (must consider hazardous waste and fuelhandling, storage, disposal, spill prevention measures, staff training and emergencycontacts)Addressed in Chapter 9;draft plan will be included indraft EIS• Waste Management Plan/Program Addressed in Chapter 9;draft plan will be included indraft EIS• Monitoring and Management Plans (e.g. water quality, air pollution, noise control andwildlife protection etc.)• If project activities are located within Caribou Protection Areas or Schedule 1 Speciesat Risk known locations, please provide a Wildlife Mitigation and Monitoring PlanAddressed in Chapter 9;draft plan will be included indraft EISAddressed in Chapter 9;draft plan will be included indraft EIS• Remediation Plan including cleanup criteria and how the criteria were derived. Addressed in Chapter 9;draft plan will be included indraft EIS• Human Health Risk Assessment of the contaminants at the site. will be included in draft EIS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!