12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Effective June 16, 200613. STUDIES UNDERTAKEN TO DATE (list and attach copies of studies, reports, research, etc.)Photocopies of the following two reports were submitted in 2004.Department of Indian and Northern Affairs, Water Management Section, Bathurst Norsemines (<strong>Hackett</strong> <strong>River</strong>),Potential Mine Water Quality Survey Network, Report Series, 1974 By: D. Sutherland, J. McLarenNorthwest Territories Water Board, Department of Indian and Northern Development, Bathurst Norsemines <strong>Hackett</strong><strong>River</strong>, Potential Mine Water Quality Survey Network, Report Series, 1975 By D.J. SutherlandThe following photocopied report was submitted in 2005 with the Annual Report.Geochemical Dispersion over Massive Sulphides within the Zone of Continuous Permafrost, Bathurst Norsemines,District of Mackenzie, N.W.T. by J. K. Millar, The University of British Columbia, December, 1978.Also submitted in 2005 with the Annual Report was a report entitled:Baseline Water Quality Monitoring Program at <strong>Hackett</strong> <strong>River</strong> <strong>Project</strong>, prepared by Gartner Lee Limited and datedDecember 6, 2004 and covering the results of water quality sampling conducted in August 2004.Submitted with the 2006 license renewal application was a report entitled:2005 Baseline Water Quality Monitoring Program – <strong>Hackett</strong> <strong>River</strong> <strong>Project</strong>, prepared for <strong>Sabina</strong> Resources Limited,submitted by Gartner Lee Limited, October 2005 covering the results of water quality sampling conducted in July2005.To be submitted at a later date, are the following reports, not yet completed:2006 Baseline Preliminary Options of the Road Route Options from <strong>Hackett</strong> <strong>River</strong> Camp to the BIPAR Road,prepared for <strong>Sabina</strong> Resources Limited, submitted by Gartner Lee Limited, November, 2006.2006 Baseline Water Quality Monitoring Program at <strong>Hackett</strong> <strong>River</strong> <strong>Project</strong>, prepared by Gartner Lee Limited,November, 2006.14. THE FOLLOWING DOCUMENTS MUST BE INCLUDED WITH THE APPLICATION FOR THEREGULATORY PROCESS TO BEGINSupplementary Questionnaire (where applicable: see section 5) Yes No If no, date expected ____________Inuktitut and/or Innuinaqtun/English Summary of <strong>Project</strong> Yes No If no, date expected ____________Application fee of $30.00 (Payee Receiver General for Canada) Yes No If no, date expected ____________Water Use fee of $30.00 (unless otherwise indicated in Section 9 of the NWT Waters Regulations; Payee ReceiverGeneral for Canada) Yes No If no, date expected ___________15. PROPOSED TIME SCHEDULE (unless otherwise indicated, the NWB will consider the application fora five (5) year term) one year or less (or) Multi YearStart Date: Feruary 15, 2007 Completion Date: October 31, 2009Page 13 of 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!