12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Project</strong> Specific Information RequirementSection in <strong>Project</strong><strong>Proposal</strong> ReportG-1 Well Authorization N/A3 i. Objective Zones (copy chart style below)ObjectiveFormationFluid(oil/gas/water) Depth (mTVD) Core (Y/N)j. Proposed Total Depth in mTDV and mMD.k. Formation of Total Depthl. Sour well? (yes or no)• If Yes: Maximum H2S concentration in mol/kmolEmergency planning zone radius in kmm. Blowout Prevention (Well Class I – VI)n. Deviation Surveys• Will be run at intervals less than 150m? (yes or no)o. Wireline logs• Will run logs in hole for surface casing? (yes or no)• Will run a minimum of 2 porosity measuring logs? (yes or no) N/AG-2 On-Land Exploration4 Indicate if the site contains any known:a. Waste Dumpsb. Fuel and Chemical Storage Areasc. Sump Areasd. Waste Water Discharge Locations N/A5 Attach maps drawn to scale showing locations of existing and proposed itemsidentified in (2) above, as well as all proposed:a. Sumpsb. Water sourcesc. Fuel and chemical storage facilitiesd. Drilling mud storage arease. Transportation routes N/A6 If utilizing fresh water, estimate maximum drawdown and recharge capability of theriver or lake from which water will be drawn.N/A7 Indicate if permafrost is expected to be encountered under:a. Camp Facilitiesb. Well Sitec. Access Routesd. Sumpse. Other: _________________ N/A8 Indicate any potential for encountering artesian aquifers or lost circulation within thesurface hole (to casing depth).N/A9 Will drilling wastes contain detrimental substances (including, but not limited to, oilbasedor invert mud and high salinity fluids)? If yes, indicate the substances andestimated volumes.N/A10 Indicate methods for disposal of drilling wastes:a. Sumpb. Down Hole (requires NEB approval)c. On-Site Treatment (provide plan)d. Off-Site (give location and method of disposal) N/A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!