12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Project</strong> Specific InformationThe following <strong>Project</strong> Types were relevant to the proposed <strong>Project</strong>:1 All-Weather Road/Access Trail Section A-1 and Section A-24 Advanced Mineral Exploration Section B-1 through Section B-85 Mine Development/Bulk Sampling Section B-1 through Section B-126 Pits and Quarries Section C11 Marine Based Activities Section H<strong>Project</strong> Specific Information RequirementSection A: Roads/TrailsA-1 <strong>Project</strong> Information1 Describe any field investigations and the results of field investigations used inselecting the proposed route (e.g. geotechnical, snow pack)2 Provide a conceptual plan of the road, including example road cross-sections andwater crossings.3 Discuss the type and volume of traffic using the road/trail (i.e. type of vehicles andcargo and number of trips annually).Section in <strong>Project</strong><strong>Proposal</strong> ReportSections 2.8.1, 2.8.2, 2.8.3No example of a crosssection or water crossing isavailable at this time. SeeSections 2.8.1 and 2.8.2 forinformation on road designand construction. SeeSection 2.8.3 for informationon crossing the <strong>Hackett</strong><strong>River</strong>. Smaller streamcrossings will be culverted,and culvert design will beapproved by DFO prior toroad construction.Section 2.8.44 Discuss public access to the road. There will not be any publicaccess for the <strong>Hackett</strong>access road. However, this<strong>Project</strong> <strong>Proposal</strong> does notaddress any BIPR publicaccess.5 Describe maintenance procedures. A Road Maintenance Planwill be included in the draftEISA-2 All-Weather Road/Access Trail6 Discuss road design considerations for permafrost. Sections 2.8.2, 2.8.37 Describe the construction materials (type and sources for materials), and the acid Sections 2.8.2, 2.8.3rock drainage (ARD) and metal leaching (ML) characteristics of the constructionmaterials.8 Discuss construction techniques, including timing for construction activities. Sections 2.8.2.5, 2.8.3.69 Indicate on a map the locations of designated refuelling areas, water crossings,culverts, and quarries/borrow sources.Only a proposed alignmentis available at this time; seeFigure 2.9-1The locations for refuelingareas, water crossings,culverts, and quarries arecurrently being evaluated aspart of the pre-feasibilitywork, which is expected tobe completed by summer2008.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!