12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Project</strong> Specific Information RequirementSection C: Pits and QuarriesSection in <strong>Project</strong><strong>Proposal</strong> Report7 Describe any existing and potential for thermokarst development and anySection 2.4.4thermokarst prevention measures.8 Describe any existing or potential for flooding and any flood control measures. Section 2.4.4, Section 2.4.59 Describe any existing or potential for erosion and any erosion control measures. Section 2.7.610 Describe any existing or potential for sedimentation and any sedimentation control Section 2.7.6measures.11 Describe any existing or potential for slumping and any slump control measures. Section 2.7.6, Section 2.4.412 Describe the moisture content of the ground. Sections 6.1.5, 6.1.813 Describe any evidence of ice lenses. Section 6.1.714 If blasting, describe methods employed. Sections 2.4.4, 2.4.515 Describe the explosive type(s), hazard class, volumes, uses, location of storage(show on map), and method of storage.16 Discuss methods used to determine acid rock drainage (ARD) and metal leaching(ML) potential and results.Sections 2.4.4.6, 2.4.5.6,2.6.5Section 2.4.617 Discuss safety measures for the workforce and the public. Safety Plans will be includedin the draft EIS; see Chapter9 for general informationSection D: Offshore InfrastructureN/AD-1 Facility N/A1 Describe any field investigations and the results of field investigations used inselecting the site (i.e. aerial surveys, bathymetric surveys, tidal processes,shoreline erosion processes, geotechnical foundation conditions)N/A2 Provide a conceptual plan, profile description and drawing(s) indicating shoreline,facility footprint, tidal variations, required vessel draft, keel offset, deck heightfreeboardN/A3 Discuss how anticipated loads on the seabed foundation and on the offloadingplatform will be incorporated into the design.N/A4 Describe how vessels will manoeuvre around the facility. (e.g. pull alongside or infront)N/A5 Discuss the anticipated life of the facility. N/AD-2 Facility Construction N/A6 Describe the types of material used for construction (i.e. granular or rock, steelpiling or sheet piling, concrete). If material is granular, consider acid rock drainagepotential, metal leaching potential, percentage of fines, size.N/A7 Describe dredging activities. N/A8 Indicate source of granular or rock material used in construction. N/A9 List quantities of the various types of material used in construction. N/A10 Describe construction method(s). N/A11 Indicate whether a site engineer will be on-site to inspect construction. N/A12 If proposed construction method involves dumping of fill into water, discussmeasures for mitigating the release of suspended solids.N/AD-3 Facility Operation N/A13 Describe maintenance activities associated with the facility (e.g. dredging,maintenance to account for potential settlement of facility,)N/A14 Discuss whether the public will have access to the facility(s) and describe publicsafety measures.N/A15 Describe cargo and container handling, transfer and storage facilities. N/A16 Indicate whether fuel will be transferred from barges at this site and describe themethod of that fuel transfer.N/A17 Discuss frequency of use. N/A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!