12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Project</strong> Descriptionrequire bridge crossing. Considerations will involve determining bridge location andconstruction methods that meet the needs of the <strong>Project</strong> and protects the aquaticenvironment;• The need for additional infrastructure at the proposed BIPR port site is also beingevaluated as part of the prefeasibility work.<strong>Sabina</strong> is committed to construct, operate and close a <strong>Project</strong> that is economically feasible, thatregulatory requirements are met, environmental and social impacts are minimized andopportunities for economic and social development are provided. This commitment will guideadditional prefeasibility studies and alternative assessment.2.11 Summary of Scope of <strong>Project</strong>LocationOpen Pit MiningMain Zone (East and West) and EastCleaver Zone.Underground MiningBoot Lake Zone and Main Zone andEast Cleaver Zone below the pit.Mining Method Conventional truck and shovel. Sub-level open stoping with backfilland/or sub-level caving.Mine Life13.6 yearsProduction Rate (Ore)10,000 t/dProduction Rate (Waste)33,400 t/d LOM averageMillfeed Source 60% 40%Mill Processing Rate10,000 t/dMill Processing MethodStandard grinding and flotation circuitsProductsCopper, Lead, Zinc concentratesTransportation and Logistics A 105 km all-season road construction to Bathurst Inlet Port (23 km mine site toBIPR route connection and 82 km to Bathurst Inlet Port along BIPR road).Concentrate haul will be operated by <strong>Sabina</strong>.Backhaul supplies and fuel to the mine site.Infrastructure and Site Port Facilities at Bathurst Inlet – Loading/unloading facilities, fuel storage,consumables storage and concentrate storage facilities.Mine Site – Airstrip, power generation, mill and maintenance shop, camp, tailingsmanagement facility, waste rock piles, limited fuel, concentrate and consumablesstorage.Markets and SmelterMainly European and North American Smelters.Potential East Asian Market for Copper and Lead Concentrate.January 2008 <strong>Hackett</strong> <strong>River</strong> <strong>Project</strong> – <strong>Project</strong> <strong>Proposal</strong> <strong>Sabina</strong> Silver CorporationReport Version B.1 2–49 Rescan Environmental Services Ltd. (Proj. #833-2)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!