12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Project</strong> Specific Information RequirementSection I: Municipal and Industrial DevelopmentSection in <strong>Project</strong><strong>Proposal</strong> Report7 Describe the firefighting equipment that are or will be installed. N/A8 Describe the noise sources, noise level in work area, technical measurements thatwill be adopted to abate the noise levels and regulatory requirements for noiseabatement and noise levels.9 Describe the type of gaseous emission that will be produced during this activity.Include the allowable thresholds and mitigation measures.N/A10 Describe odours that the activity might release and include corresponding allowablethreshold. Describe mitigation measures if thresholds are exceeded.N/A11 Describe radiation sources that might be emitted during the activity. Include typeand source and include mitigation measures. Also describe preventative measuresfor human exposure (i.e. PPE).N/A12 Discuss the employee safety and environment protection training program. N/A13 If the activity involves a bulk fuel storage facility, include drawings showing the bulkfuel storage facility location in proximity to natural water courses, high water marks,etc.N/A14 If the activity involves the development of a new quarry or expansion of an existingquarry, complete Section C.N/AN/AN/A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!